Summary

PREL202205653
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
ELECTRICAL BUILD OUT AND ELECTRICAL FEES KURA SUSHI MOA 379 NORTH GARDEN BLOOMINGTON MN
05/19/2022
05/26/2022
05/15/2023
11/16/2022

Locations

Permits

Permit Number: PREL202205653

Electrical
Finaled
05/26/2022
05/15/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Not Ready 7/26/2022 (10:00 - 12:00) 7/26/2022 (AM) 07/26/2022
Electrical Rough-in Inspection Partial Pass 7/26/2022 (10:00 - 12:00) 7/26/2022 (AM) 07/26/2022
Corrections:


Miscellaneous/Other
Comment Only
07/26/2022
Wall RI back area- ok Still need store front and above ceiling.

Electrical Rough-in Inspection Passed 8/16/2022 (8:00 - 10:00) 8/16/2022 (AM) 08/16/2022
Corrections:


Miscellaneous/Other
Comment Only
08/16/2022
Above ceilings in front soffit area - ok

Electrical Rough-in Inspection Partial Pass 10/12/2022 (12:30 - 2:30) 10/12/2022 (PM) 10/12/2022
Corrections:


Miscellaneous/Other
Comment Only
10/12/2022
Transformer inspection- OK

Miscellaneous/Other
Carried Forward
10/12/2022
Conveyor system will require third party evaluation. Will be sending email to PM and GF onsite.

Electrical Rough-in Inspection Partial Pass 10/18/2022 (12:30 - 2:30) 10/18/2022 (PM) 10/19/2022
Corrections:


Miscellaneous/Other
Carried Forward
10/19/2022
Conveyor system will require third party evaluation. Will be sending email to PM and GF onsite.

Miscellaneous/Other
Comment Only
10/19/2022
Above ceiling, remove temp wiring to lighting in side space. ok to cover

Electrical Final Inspection Failed 10/31/2022 (10:00 - 12:00) 10/31/2022 (AM) 10/31/2022
Corrections:


Miscellaneous/Other
Carried Forward
10/31/2022
Area not ready. Missing receptacles, equipment evaluation etc…

Electrical Final Inspection Partial Pass 11/3/2022 (10:00 - 12:00) 11/3/2022 (AM) 11/04/2022
Corrections:


Miscellaneous/Other
Resolved
11/04/2022
Area not ready. Missing receptacles, equipment evaluation etc…

Miscellaneous/Other
Comment Only
11/04/2022
OK to Stock. Kitchen equipment - ok Missing evaluation for conveyor system.

Electrical Final Inspection Passed 11/16/2022 (10:00 - 12:00) 11/16/2022 (AM) 11/16/2022
Corrections:


Miscellaneous/Other
Comment Only
11/16/2022
Engineer report received, attached to permit. Final - ok for occupancy.