PREL202206764
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Partial Pass | 6/15/2022 (10:00 - 12:00) | 6/15/2022 (AM) | 06/16/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
06/16/2022
Transformer install for new tool. Tool requires NRTL evaluation.
|
||||
Miscellaneous/Other
Carried Forward
06/16/2022
Transformer GEC and supply side bonding jumper needs to be sized at #4
|
||||
Electrical Final Inspection | Passed | 12/21/2022 | ||
Corrections:
Miscellaneous/Other
Resolved
12/21/2022
Transformer install for new tool. Tool requires NRTL evaluation.
|
||||
Miscellaneous/Other
Resolved
12/21/2022
Transformer GEC and supply side bonding jumper needs to be sized at #4
|
||||
Miscellaneous/Other
Comment Only
12/21/2022
NRTL report attached. GEC replaced - ok
|