PREL202211604
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Failed | 10/7/2022 (12:30 - 2:30) | 10/7/2022 (PM) | 10/11/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
10/11/2022
Site meet, to review LV lighting system. Discussed the NEC 411 system and the requirements.
Contractor to review and submit possible fix for power supplies that do not meet the class 2/ listing requirements of the system.
|
||||
Electrical Final Inspection | Passed | 11/18/2022 (10:00 - 12:00) | 11/18/2022 (AM) | 11/18/2022 |
Corrections:
Miscellaneous/Other
Resolved
11/18/2022
Site meet, to review LV lighting system. Discussed the NEC 411 system and the requirements.
Contractor to review and submit possible fix for power supplies that do not meet the class 2/ listing requirements of the system.
|
||||
Miscellaneous/Other
Comment Only
11/18/2022
New listed class 2 power supplies installed for strip lighting. Class 2 wiring installed -ok
|