PREL202213652
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
12/01/2022
GEC on 200a service needs to be connected to Neutral bar.
The frame of the trailer required to be bonded to a Grounding electrode.
Available fault currents will be required to be labeled when service connections completed.
|
||||
Electrical Final Inspection | Partial Pass | 12/1/2022 (10:00 - 12:00) | 12/1/2022 (AM) | 12/01/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
12/01/2022
GEC on 200a service needs to be connected to Neutral bar.
The frame of the trailer required to be bonded to a Grounding electrode.
Available fault currents will be required to be labeled when service connections completed.
|
||||
Miscellaneous/Other
Comment Only
12/01/2022
Services released to Xcel for connection.
|