PREL202214714
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Electrical Final Inspection | Failed | 3/17/2023 (8:00 - 10:00) | 3/17/2023 (AM) | 03/17/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
03/17/2023
Grounded conductor not bonded to service panel.
|
||||
Miscellaneous/Other
Carried Forward
03/17/2023
Available fault currents need to be labeled on panel to verify proper equipment rating.
|
||||
Electrical Final Inspection | Partial Pass | 3/23/2023 (12:30 - 2:30) | 3/23/2023 (PM) | 03/23/2023 |
Corrections:
Miscellaneous/Other
Resolved
03/23/2023
Grounded conductor not bonded to service panel.
|
||||
Miscellaneous/Other
Resolved
03/23/2023
Available fault currents need to be labeled on panel to verify proper equipment rating.
|
||||
Miscellaneous/Other
Comment Only
03/23/2023
Contacted Xcel Energy for temporary service overhead for car wash 200 amp 3 phase 120V/ 208V.
|