PREL202214885
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Failed | 12/9/2022 (10:00 - 12:00) | 12/9/2022 (AM) | 12/09/2022 |
Failed R.I. Walls only with wall with no boxes and MC cable in cutout opening. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
12/09/2022
Need to mount boxes on open stud wall and not just have the MC cable into the cut opening.
Switch by bathroom has open knockout in the box that will be closed up with Sheetrock when done.
Ceiling soffits up front need access panel for junction boxes if closing it up with Sheetrock.
|
||||
Electrical Rough-in Inspection | Partial Pass | 12/14/2022 (10:00 - 12:00) | 12/14/2022 (AM) | 12/14/2022 |
R.I. Walls only. | ||||
Corrections:
Miscellaneous/Other
Carried Forward
12/14/2022
Need to mount boxes on open stud wall and not just have the MC cable into the cut opening.
Switch by bathroom has open knockout in the box that will be closed up with Sheetrock when done.
Ceiling soffits up front need access panel for junction boxes if closing it up with Sheetrock.
|
||||
Miscellaneous/Other
Comment Only
12/14/2022
Corrections fixed for the R.I of walls only.
|
||||
Electrical Rough-in Inspection | Partial Pass | 1/3/2023 (8:00 - 10:00) | 1/3/2023 (AM) | 01/03/2023 |
Partial ceilings. | ||||
Corrections:
Miscellaneous/Other
Resolved
01/03/2023
Need to mount boxes on open stud wall and not just have the MC cable into the cut opening.
Switch by bathroom has open knockout in the box that will be closed up with Sheetrock when done.
Ceiling soffits up front need access panel for junction boxes if closing it up with Sheetrock.
|
||||
Miscellaneous/Other
Comment Only
01/03/2023
R.I. Ceilings hard lid bathroom area and some classrooms.
|
||||
Electrical Final Inspection | Failed | 2/24/2023 (2:30 - 3:30) | 2/24/2023 (PM) | 02/24/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
02/24/2023
NEC 240.83(D) circuit breaker not rated as a switch to control the open floor exhibit area for the track lights.
Need to add switches on the wall.
Did R.I of ceilings with all the ceiling tiles installed with the new ceiling grid.
Should have had R. I. before the tiles were installed.
I climbed the ladder this time for the 4 classrooms, always call for R. I. when lights are being installed for support of fixtures and wiring methods.
|
||||
Electrical Final Inspection | Passed | 2/28/2023 (2:30 - 3:30) | 2/28/2023 (PM) | 02/28/2023 |
Corrections:
Miscellaneous/Other
Resolved
02/28/2023
NEC 240.83(D) circuit breaker not rated as a switch to control the open floor exhibit area for the track lights.
Need to add switches on the wall.
Did R.I of ceilings with all the ceiling tiles installed with the new ceiling grid.
Should have had R. I. before the tiles were installed.
I climbed the ladder this time for the 4 classrooms, always call for R. I. when lights are being installed for support of fixtures and wiring methods.
|