PREL202215105
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Underground Electrical Inspection | Partial Pass | 1/26/2023 (7:00 - 8:00) | 1/26/2023 (AM) | 01/26/2023 |
Corrections:
Miscellaneous/Other
Comment Only
01/26/2023
UG for interior- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/1/2023 (12:30 - 2:30) | 3/1/2023 (PM) | 03/02/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/02/2023
Partial wall RI- ok to spray foam.
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/22/2023 (12:30 - 2:30) | 3/22/2023 (PM) | 03/23/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/23/2023
Wall RI and shaft piping to roof - ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/4/2023 (8:00 - 10:00) | 4/4/2023 (AM) | 04/04/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/04/2023
RI for vestibule area - ok
|
||||
Electrical Rough-in Inspection | Passed | 4/20/2023 (12:30 - 2:30) | 4/20/2023 (PM) | 04/20/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/20/2023
Wall RI for cooler area
|
||||
Underground Electrical Inspection | Partial Pass | 5/11/2023 (12:30 - 2:30) | 5/11/2023 (PM) | 05/11/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/11/2023
UG feeder pipes to grocery- ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 6/6/2023 (8:00 - 10:00) | 6/6/2023 (AM) | 06/06/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
06/06/2023
Above ceiling - ok
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/17/2023 (10:00 - 12:00) | 8/17/2023 (AM) | 08/17/2023 |
Corrections:
Miscellaneous/Other
Resolved
08/17/2023
Above ceiling - ok
|
||||
Miscellaneous/Other
Carried Forward
08/17/2023
Service requires GFPE and Arc Energy reduction testing before energizing.
|
||||
Miscellaneous/Other
Comment Only
08/17/2023
Sub panels inside store- ok
|
||||
Electrical Final Inspection | Partial Pass | 9/22/2023 (10:00 - 12:00) | 9/22/2023 (AM) | 09/26/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/26/2023
Partial floor area finals- ok
|
||||
Electrical Final Inspection | Partial Pass | 10/2/2023 (10:00 - 12:00) | 10/2/2023 (AM) | 10/03/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
10/03/2023
Fault current labeling on all panels.
|
||||
Miscellaneous/Other
Carried Forward
10/03/2023
Some equipment with fault current labeling has CB not properly rated for faults.
|
||||
Miscellaneous/Other
Carried Forward
10/03/2023
Vent piping on roof installed in front equipment service doors. Either equipment or pipe required to be moved to allow for proper clearances.
|
||||
Miscellaneous/Other
Carried Forward
10/03/2023
A safe switching procedure shall be completed for location and disconnection of the building.
|
||||
Electrical Final Inspection | Partial Pass | 10/24/2023 (12:30 - 2:30) | 10/24/2023 (PM) | 10/24/2023 |
Corrections:
Miscellaneous/Other
Resolved
10/24/2023
Fault current labeling on all panels.
|
||||
Miscellaneous/Other
Resolved
10/24/2023
Some equipment with fault current labeling has CB not properly rated for faults.
|
||||
Miscellaneous/Other
Resolved
10/24/2023
Vent piping on roof installed in front equipment service doors. Either equipment or pipe required to be moved to allow for proper clearances.
|
||||
Miscellaneous/Other
Carried Forward
10/24/2023
A safe switching procedure shall be completed for location and disconnection of the building.
|
||||
Electrical Final Inspection | Passed | 11/08/2023 | ||
Corrections:
Miscellaneous/Other
Resolved
11/08/2023
A safe switching procedure shall be completed for location and disconnection of the building.
|
||||
Miscellaneous/Other
Comment Only
11/08/2023
Plan attached to permit.
|