PREL202215742
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 1/4/2023 (10:00 - 12:00) | 1/4/2023 (AM) | 01/04/2023 |
Corrections:
Miscellaneous/Other
Comment Only
01/04/2023
Wall RI- ok
Above ceiling required.
|
||||
Miscellaneous/Other
Carried Forward
01/04/2023
FA in ceiling clean up required. Must be done by mall contractor.
|
||||
Miscellaneous/Other
Carried Forward
01/04/2023
As- built drawings required for final completion when project completed.
|
||||
Electrical Rough-in Inspection | Passed | 2/1/2023 (12:30 - 2:30) | 2/1/2023 (PM) | 02/01/2023 |
Corrections:
Miscellaneous/Other
Resolved
02/01/2023
FA in ceiling clean up required. Must be done by mall contractor.
|
||||
Miscellaneous/Other
Resolved
02/01/2023
As- built drawings required for final completion when project completed.
|
||||
Electrical Final Inspection | Passed | 2/1/2023 (12:30 - 2:30) | 2/1/2023 (PM) | 02/01/2023 |