PREL202300111
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 2/21/2023 (12:30 - 2:30) | 2/21/2023 (PM) | 02/21/2023 |
Corrections:
Miscellaneous/Other
Comment Only
02/21/2023
R. I. Walls only.
|
||||
Electrical Rough-in Inspection | Partial Pass | 3/9/2023 (10:00 - 12:00) | 3/9/2023 (AM) | 03/09/2023 |
above ceiling | ||||
Corrections:
Miscellaneous/Other
Comment Only
03/09/2023
R.I. Ceilings hard lid soffits and elevator area.
Looked at Transformer room for wiring before shutdown.
Fixing the heating unit fused disconnects in the ceiling that are facing down instead of vertical mounting.
|
||||
Electrical Rough-in Inspection | Partial Pass | 4/19/2023 (8:00 - 10:00) | 4/19/2023 (AM) | 04/19/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/19/2023
R. I. Ceilings half the 7th floor area- south to south east side.
|
||||
Above Ceiling Inspection | Passed | 5/10/2023 (8:00 - 10:00) | 5/10/2023 (AM) | 05/10/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/10/2023
R. I. Ceilings for the rest of the 7th floor.
|
||||
Electrical Final Inspection | Partial Pass | 6/2/2023 (10:00 - 12:00) | 6/2/2023 (AM) | 06/02/2023 |
Corrections:
Miscellaneous/Other
Carried Forward
06/02/2023
Temporary Final -
Missing lights in cafeteria,
Need labels and panel directories on all electrical equipment and disconnects for Final Inspection.
|
||||
Electrical Final Inspection | Passed | 6/22/2023 (12:30 - 2:30) | 6/22/2023 (PM) | 06/22/2023 |
Corrections:
Miscellaneous/Other
Resolved
06/22/2023
Temporary Final -
Missing lights in cafeteria,
Need labels and panel directories on all electrical equipment and disconnects for Final Inspection.
|
||||
Miscellaneous/Other
Comment Only
06/22/2023
Final inspection for 7th floor all corrections were done.
|