PREL202301298
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Passed | 2/16/2023 (8:00 - 10:00) | 2/16/2023 (AM) | 02/16/2023 |
Corrections:
Miscellaneous/Other
Comment Only
02/16/2023
Temporary power 400 amp single phase for construction site and trailer.
Notified Xcel Energy for meter installation.
Xcel on site terminating wires to the pole when I was there.
|
||||
Electrical Final Inspection | Partial Pass | 4/27/2023 (12:30 - 2:30) | 4/27/2023 (PM) | 04/27/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/27/2023
R. I. - U. G. - 2 1/2 inch conduit from temporary service into the building and set a 200 amp panel.
|
||||
Electrical Final Inspection | Partial Pass | 5/22/2023 (12:30 - 2:30) | 5/22/2023 (PM) | 05/22/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/22/2023
R. I. Lights and receptacles for cameras on 4 posts on job site for security of construction site.
|