PREL202302182
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 4/3/2023 (12:30 - 2:30) | 4/3/2023 (PM) | 04/03/2023 |
|
Corrections:
Miscellaneous/Other
Comment Only
04/03/2023
R. I. Walls 1st floor lab.
|
||||
| Electrical Rough-in Inspection | Passed | 5/15/2023 (10:00 - 12:00) | 5/15/2023 (AM) | 05/15/2023 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/15/2023
R. I. Ceilings 1st floor lab.
|
||||
| Electrical Final Inspection | Partial Pass | 6/16/2023 (12:30 - 2:30) | 6/16/2023 (PM) | 06/16/2023 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/16/2023
Temporary final- need to have final panel directories and disconnects labeled.
Need to finish lighting with replacement lights and need to wire for tables that need power to them.
|
||||
| Electrical Final Inspection | Passed | 8/3/2023 (8:00 - 10:00) | 8/3/2023 (AM) | 08/03/2023 |