PREL202302983
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 5/17/2023 (12:30 - 2:30) | 5/17/2023 (PM) | 05/17/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/17/2023
R. I. Underground parking garage, PVC piping.
Went over questions on site for inspections and service grounding to water main and concrete encased electrode.
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/23/2023 (12:30 - 2:30) | 5/23/2023 (PM) | 05/23/2023 |
Corrections:
Miscellaneous/Other
Comment Only
05/23/2023
Site visit for security cameras wiring.
|
||||
Electrical Rough-in Inspection | Partial Pass | 6/6/2023 (12:30 - 2:30) | 6/6/2023 (PM) | 06/06/2023 |
Corrections:
Miscellaneous/Other
Comment Only
06/06/2023
Walk site
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/8/2023 (12:30 - 2:30) | 8/8/2023 (PM) | 08/08/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/08/2023
R..I. Underground to electrical concrete vault with 6 - 3 1/2 inch conduits and 4- 2 1/2 inch conduits.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/23/2023 (12:30 - 2:30) | 8/23/2023 (PM) | 08/23/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/23/2023
R. I. Mock up unit 520.
Code questions on site.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/6/2023 (12:30 - 2:30) | 9/6/2023 (PM) | 09/06/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/06/2023
R. I. 5th floor rooms 512,523,514,515,516,517,
518,519,521,522,523,524,
525,543.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/7/2023 (12:30 - 2:30) | 9/7/2023 (PM) | 09/07/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/07/2023
R. I. Rooms 5th floor- 501,502,503,504,505,506,
507,508,509,510,511,535,537
531,532,545,548.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/20/2023 (10:00 - 12:00) | 9/20/2023 (AM) | 09/20/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/20/2023
R. I. Rooms - 5th floor ceilings 541,538.
4th floor rooms- 413,416,417,418,419,420,
421,422,423,424,425.
|
||||
Electrical Rough-in Inspection | Partial Pass | 9/26/2023 (10:00 - 12:00) | 9/26/2023 (AM) | 09/26/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/26/2023
R. I. Area’s- 4th floor
401,403,404,405,406,407
408,409,410,411,432,434,
435,437,441,448.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/3/2023 (12:30 - 2:30) | 10/3/2023 (PM) | 10/03/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/03/2023
R. I. 5th floor corridor hard lid ceilings.
Looked at temp power for job site going overhead instead of on the temporary fence that was removed.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/4/2023 (8:00 - 10:00) | 10/4/2023 (AM) | 10/04/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/04/2023
R. I. 3rd floor units- 312,313,314,315,316,317,
318,319,320,321,322,323,
324,325,343.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/11/2023 (12:30 - 2:30) | 10/11/2023 (PM) | 10/11/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/11/2023
3rd floor south- rooms 301,302,303,304,305,306,307,308,309,310,331,334,335,345.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/18/2023 (10:00 - 12:00) | 10/18/2023 (AM) | 10/18/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/18/2023
2nd floor R. I. - 212,213,214,215,216,218,219,221,222,224,225,243.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/24/2023 (10:00 - 12:00) | 10/24/2023 (AM) | 10/24/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/24/2023
R. I. 2nd floor south side units- 201,202,203,204,205,206,
207,208,209,210,231,235,
237,241,245,248.
|
||||
Electrical Rough-in Inspection | Partial Pass | 10/31/2023 (8:00 - 10:00) | 10/31/2023 (AM) | 10/31/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/31/2023
R. I. 1st floor units- 112,113,114,115,1116,117,118,119,120,121,122,123,124,125,143.
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/1/2023 (8:00 - 10:00) | 11/1/2023 (AM) | 11/01/2023 |
Corrections:
Miscellaneous/Other
Comment Only
11/01/2023
R. I. 1st floor- Units 101,102,103,104,105,106,107,108,109,110,111,130,131,132,133,134,135,137,138,145,146,148.
|
||||
Electrical Rough-in Inspection | Partial Pass | 11/28/2023 (8:00 - 10:00) | 11/28/2023 (AM) | 11/28/2023 |
Corrections:
Miscellaneous/Other
Comment Only
11/28/2023
R. I. Garage level ceilings for spray foam.
|
||||
Electrical Final Inspection | Partial Pass | 1/23/2024 (8:00 - 10:00) | 1/23/2024 (AM) | 01/23/2024 |
Corrections:
Miscellaneous/Other
Comment Only
01/23/2024
Inspected the 3000 amp service and equipment and contacted Xcel Energy to energize when the transformer is installed later in the week.
|
||||
Electrical Final Inspection | Partial Pass | 2/14/2024 (8:00 - 10:00) | 2/14/2024 (AM) | 02/14/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/14/2024
Final 5th floor units- 501-512 also 525,537,538,548.
|
||||
Electrical Final Inspection | Partial Pass | 2/15/2024 (8:00 - 10:00) | 2/15/2024 (AM) | 02/15/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/15/2024
Final 5th floor units 513-524.
|
||||
Electrical Final Inspection | Partial Pass | 2/20/2024 (8:00 - 10:00) | 2/20/2024 (AM) | 02/20/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/20/2024
Final units 4th floor 401-412 and common areas 441&445.
|
||||
Electrical Final Inspection | Partial Pass | 2/21/2024 (8:00 - 10:00) | 2/21/2024 (AM) | 02/21/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/21/2024
Final 5th floor common areas- 531,532,545.
Final 4th floor units 413-424.
|
||||
Electrical Final Inspection | Partial Pass | 2/22/2024 (8:00 - 10:00) | 2/22/2024 (AM) | 02/22/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/22/2024
4th floor- Finals 431,432,434,435,441,445-
3rd floor- Finals 301,302,303,305,306,307,308,309,310,311.
Need to fix- 304 - living room circuit keeps tripping out.
345 restroom GFCI not working properly.
|
||||
Electrical Final Inspection | Partial Pass | 2/26/2024 (8:00 - 10:00) | 2/26/2024 (AM) | 02/26/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/26/2024
Final 14 Units- 312-325.
Common areas -331,333,334,335,338,341.
|
||||
Electrical Final Inspection | Partial Pass | 2/27/2024 (8:00 - 10:00) | 2/27/2024 (AM) | 02/27/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/27/2024
Looked in garage by the elevator area for R. I. of MC cables.
On the roof for solar panels and found contractor who was doing the work.
|
||||
Electrical Final Inspection | Partial Pass | 2/28/2024 (8:00 - 10:00) | 2/28/2024 (AM) | 02/28/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/28/2024
Final units 201-211 and rooms 234,235,245,246.
Some panel directories on 2nd floor need better descriptions on circuits, not just acronyms.
|
||||
Electrical Final Inspection | Partial Pass | 2/29/2024 (10:00 - 12:00) | 2/29/2024 (AM) | 02/29/2024 |
Corrections:
Miscellaneous/Other
Comment Only
02/29/2024
R. I. Electrical lobby hard lid ceilings in garage level.
Make sure you use approved strapping materials for strapping MC cables, electrical tape not an approved strapping method.
Final Units 212-216
220-225, 241.
Rooms 217,218,219 failed inspection for no power to the rooms.
|
||||
Electrical Final Inspection | Partial Pass | 3/4/2024 (8:00 - 10:00) | 3/4/2024 (AM) | 03/04/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/04/2024
Final rooms- 101,102,103,106,107,108,109,111,134,135,144.
231,233,345.
|
||||
Electrical Final Inspection | Partial Pass | 3/5/2024 (8:00 - 10:00) | 3/5/2024 (AM) | 03/05/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/05/2024
Final 1st floor- Rooms 112- 125.
|
||||
Electrical Final Inspection | Partial Pass | 3/6/2024 (8:00 - 10:00) | 3/6/2024 (AM) | 03/06/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/06/2024
5th, 4th and 3rd floors all areas are final for electrical inspection.
2nd floor electrical room needs cleaning.
1st floor common areas - Mail room, 139,144,145,146 -Ok.
|
||||
Electrical Final Inspection | Partial Pass | 3/7/2024 (8:00 - 10:00) | 3/7/2024 (AM) | 03/07/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/07/2024
Garage area - Ok except for elevator lobby area and placing bollards for protection on EV chargers and mechanical equipment.
Overhead wires for cameras on outside poles will be removed April 1st I was told.
Temporary final for the building but need to clean the electrical rooms and finish the handicap rooms.
|
||||
Lighting Inspection | Passed | 3/7/2024 (7:00 - 8:00) | 3/7/2024 (AM) | 03/08/2024 |
MWF Oxboto Heights | ||||
Electrical Final Inspection | Partial Pass | 3/13/2024 (8:00 - 10:00) | 3/13/2024 (AM) | 03/13/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/13/2024
Final 1st floor 104,105,110 and common area’s.
2nd floor 217-225, 235,237,238,241,243,248.
Rooftop equipment-Ok.
Will look at Garage level when the concrete bollards are mounted for EV chargers and equipment.
Also after April 1st for overhead wires for cameras on poles and temporary power removed.
|
||||
Electrical Final Inspection | Partial Pass | 3/14/2024 (10:00 - 12:00) | 3/14/2024 (AM) | 03/14/2024 |
Corrections:
Miscellaneous/Other
Comment Only
03/14/2024
Call for final inspection when temporary power and wiring for the cameras on the Xcel poles are removed.
Everything else is -Ok for temporary final inspection.
|
||||
Electrical Final Inspection | Passed | 4/1/2024 (12:30 - 2:30) | 4/1/2024 (PM) | 04/01/2024 |