Permit Application Status

PREL202304075


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202304075
Electrical
Finaled
G&I VIII WF PLAZA LLC
Alteration/Repair/Replace
New Lighting - Relocate Switching. Added general receptacles.
04/25/2023
05/24/2023
01/09/2024
07/13/2023

Locations

Permits

Permit Number: PREL202304075

Electrical
Finaled
05/24/2023
01/09/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Failed 5/26/2023 (10:00 - 12:00) 5/26/2023 (AM) 05/26/2023
Corrections:


Miscellaneous/Other
Comment Only
05/26/2023
Called Trent left two messages Permit says 8th floor- no access every door locked

Electrical Rough-in Inspection Partial Pass 5/31/2023 (8:00 - 10:00) 5/31/2023 (AM) 05/31/2023
Corrections:


Miscellaneous/Other
Comment Only
05/31/2023
R. I. Walls 18th floor.

Electrical Rough-in Inspection Not Ready 6/16/2023 (10:00 - 12:00) 6/16/2023 (AM) 06/16/2023
Same-day cancellation, rescheduling for Tuesday 6/20. thanks- vm 6/16/23
Corrections:


Miscellaneous/Other
Comment Only
06/16/2023
Inspection canceled.

Electrical Rough-in Inspection Passed 6/20/2023 (10:00 - 12:00) 6/20/2023 (AM) 06/20/2023
Corrections:


Miscellaneous/Other
Comment Only
06/20/2023
R. I. Ceilings 18th floor for lights and power wiring.

Electrical Final Inspection Failed 7/10/2023 (10:00 - 12:00) 7/10/2023 (AM) 07/10/2023
Corrections:


Miscellaneous/Other
Carried Forward
07/10/2023
Need Elevator lobby area lights installed. Need panel directory for final inspection. Duplex receptacles not working in some offices with all the breakers on- electrician knows which ones to fix. Counter top GFCI not working with the other two receptacles. Open space area for modular furniture has no power and will give final when all office powered furniture is installed.

Electrical Final Inspection Passed 7/13/2023 (8:00 - 10:00) 7/13/2023 (AM) 07/13/2023
Corrections:


Miscellaneous/Other
Resolved
07/13/2023
Need Elevator lobby area lights installed. Need panel directory for final inspection. Duplex receptacles not working in some offices with all the breakers on- electrician knows which ones to fix. Counter top GFCI not working with the other two receptacles. Open space area for modular furniture has no power and will give final when all office powered furniture is installed.