PREL202304192
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Partial Pass | 6/8/2023 (10:00 - 12:00) | 6/8/2023 (AM) | 06/08/2023 |
Corrections:
Miscellaneous/Other
Comment Only
06/08/2023
R. I. Walls for front office area and bathroom area and break area in the middle of the building.
Went over questions on the Service, spray paint booths and outside lights.
|
||||
Electrical Rough-in Inspection | Partial Pass | 8/3/2023 (12:30 - 2:30) | 8/3/2023 (PM) | 08/03/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/03/2023
R. I. Ceilings for offices.
|
||||
Electrical Final Inspection | Partial Pass | 8/29/2023 (8:00 - 10:00) | 8/29/2023 (AM) | 08/29/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/29/2023
Rooftop units-Ok
Front offices looked at.
Questions on the spray booths and mixing room.
|
||||
Electrical Final Inspection | Partial Pass | 8/30/2023 (12:30 - 2:30) | 8/30/2023 (PM) | 08/30/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/30/2023
Partial pass final inspection- still working on mixer room wiring for the controller.
Working on power for the reception area and front door vestibule area for vestibule heater.
|
||||
Electrical Final Inspection | Passed | 9/5/2023 (12:30 - 2:30) | 9/5/2023 (PM) | 09/05/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/05/2023
Final for the building except for the front sign which will be a separate permit for the electrical- it also will need a UL or NRTL label otherwise it will need a third party evaluation for the signs.
|
||||
Lighting Inspection | Passed | 09/19/2023 | ||
Bloomington Collision parking lot lighting | ||||
Corrections:
Miscellaneous/Other
Outstanding
09/19/2023
western stall 4.6 and eastern side 3.4 FC - Nick Johnson inspected on 9/18/2023 - PASSED
|