PREL202311210
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Final Inspection | Failed | 10/18/2023 (12:30 - 2:30) | 10/18/2023 (PM) | 10/18/2023 |
|
Corrections:
Miscellaneous/Other
Carried Forward
10/18/2023
Left message for contractor.
AC disconnect needs to be properly secured to dwelling.
Meter enclosure not secured to dwelling.
|
||||
| Electrical Final Inspection | Passed | 10/27/2023 (8:00 - 10:00) | 10/27/2023 (AM) | 10/27/2023 |
|
Corrections:
Miscellaneous/Other
Resolved
10/27/2023
Left message for contractor.
AC disconnect needs to be properly secured to dwelling.
Meter enclosure not secured to dwelling.
|
||||
| Electrical Rough-in Inspection | Passed | 10/27/2023 (8:00 - 10:00) | 10/27/2023 (AM) | 10/27/2023 |