Permit Application Status

PREL202312704


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202312704
Electrical
Expired
OXBOW REALTY PARTNERS LLC
Alteration/Repair/Replace
1. Provide 200A 208V power from switch gear located in room to Mirra Tool electrical rack. 200A disconnect and breaker included. 2. Provide and install 75KVA transformer. 3. 20A 120V feed from system controller to mesa cleaner, twist lock receptacle, 20A breaker. 4. 20A 208V feed from system controller to mesa cleaner, twist lock receptacle, 20A breaker 5. (2) 20A 120V feeds from system controller to ULPA filter, twist lock receptacles, 20A breakers. 6. 30A 120V feed from system controller to SMIF FABS, 30A disconnect, 30A breaker. 7. 20A 120V UPS fed quad box for PC, 20A breaker. 8. 20A 120 UPS fed quad box on back of tool, 20A breaker. 9. 20A feed for process vacuum, disconnect, 20A breaker. 10. 20A feed for scrubbed exhaust fan, disconnect, 20A breaker. 11. 20A feed for general exhaust fan, disconnect, 20A breaker. 12. 20A feed to PCW, twist lock receptacle, 20A breaker. 13. 20A feed to Mirra chem pump, twist lock receptacle, 20A breaker. 14. 20A feed to Mirra 1730 chem pump, twist lock receptacle, 20A breaker. 15. 20A feed to sanitary/HF waste pump, twist lock receptacle, 20A breaker. 16. 20A feed to storm/AWN pump, twist lock receptacle, 20A breaker. 17. ½’’ conduit from main system controller to tool EMO. B. NRTL C. Install (2) flush mount quad convenience receptacles.
10/16/2023
10/18/2023
07/09/2024

Locations

Permits

Permit Number: PREL202312704

Electrical
Expired
10/18/2023
07/09/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
01/11/2024
New tool install requires NRTL evaluation. Install of pipe and wiring- ok

Electrical Rough-in Inspection Passed 1/11/2024 (10:00 - 12:00) 1/11/2024 (AM) 01/11/2024
Corrections:


Miscellaneous/Other
Comment Only
01/11/2024
RI for new tool, xformer not required for this install. Direct wire 200a - ok

Electrical Final Inspection Partial Pass 1/11/2024 (10:00 - 12:00) 1/11/2024 (AM) 01/11/2024
Corrections:


Miscellaneous/Other
Carried Forward
01/11/2024
New tool install requires NRTL evaluation. Install of pipe and wiring- ok