PREL202313260
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Passed | 1/23/2024 (12:30 - 2:30) | 1/23/2024 (PM) | 01/23/2024 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/23/2024
R. I. 3rd floor low voltage wiring.
|
||||
| Electrical Final Inspection | Partial Pass | 1/29/2024 (12:30 - 2:30) | 1/29/2024 (PM) | 01/29/2024 |
| Same-day inspection. thx vm 1/29/24 | ||||
|
Corrections:
Miscellaneous/Other
Comment Only
01/29/2024
Final on north side only, there will be a final on the south side later.
|
||||
| Electrical Final Inspection | Passed | 2/12/2024 (12:30 - 2:30) | 2/12/2024 (PM) | 02/12/2024 |