Summary

PREL202314121
Electrical
Finaled
OXBOW REALTY PARTNERS LLC
Alteration/Repair/Replace
Base building for future tool fittings.
11/17/2023
12/11/2023
03/02/2025
09/03/2024

Locations

Permits

Permit Number: PREL202314121

Electrical
Finaled
12/11/2023
03/02/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 1/9/2024 (8:00 - 10:00) 1/9/2024 (AM) 01/09/2024
Corrections:


Miscellaneous/Other
Comment Only
01/09/2024
UG inspection of grounding electrodes- ok

Electrical Rough-in Inspection Partial Pass 2/7/2024 (8:00 - 10:00) 2/7/2024 (AM) 02/07/2024
Corrections:


Miscellaneous/Other
Comment Only
02/07/2024
Site meet to discuss placement of filters.

Electrical Rough-in Inspection Partial Pass 4/19/2024 (8:00 - 10:00) 4/19/2024 (AM) 04/22/2024
Progress Inspection.
Corrections:


Miscellaneous/Other
Comment Only
04/22/2024
Progress inspection- ok

Electrical Rough-in Inspection Partial Pass 5/24/2024 (12:30 - 2:30) 5/24/2024 (PM) 05/24/2024
Corrections:


Miscellaneous/Other
Carried Forward
05/24/2024
Site meet for chiller door swing. Serviceable equipment requires door to swing minimum 90 degrees open.

Electrical Rough-in Inspection Partial Pass 6/18/2024 (10:00 - 12:00) 6/18/2024 (AM) 06/18/2024
Corrections:


Miscellaneous/Other
Resolved
06/18/2024
Site meet for chiller door swing. Serviceable equipment requires door to swing minimum 90 degrees open.

Miscellaneous/Other
Carried Forward
06/18/2024
Verify clearances discussed.

Miscellaneous/Other
Comment Only
06/18/2024
Rooftop HVAC units, chiller, and air scrubber

Electrical Rough-in Inspection Partial Pass 7/16/2024 (10:00 - 12:00) 7/16/2024 (AM) 07/16/2024
Corrections:


Miscellaneous/Other
Resolved
07/16/2024
Verify clearances discussed.

Miscellaneous/Other
Comment Only
07/16/2024
Connection of three transformers- ok

Electrical Rough-in Inspection Partial Pass 8/14/2024 (10:00 - 12:00) 8/14/2024 (AM) 08/14/2024
Corrections:


Miscellaneous/Other
Comment Only
08/14/2024
Meeting on site

Electrical Final Inspection Passed 9/3/2024 9/3/2024 (AM) 09/03/2024