PREL202400572
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Partial Pass | 2/1/2024 (10:00 - 12:00) | 2/1/2024 (AM) | 02/02/2024 |
Corrections:
Miscellaneous/Other
Carried Forward
02/02/2024
Install of new lighting control panels in switchgear.
Available fault current labeling required for new panels.
Verify if square D equipment is allowed in Eaton gear.
|
||||
Electrical Final Inspection | Passed | 4/25/2024 (12:30 - 2:30) | 4/25/2024 (PM) | 04/26/2024 |
Corrections:
Miscellaneous/Other
Resolved
04/26/2024
Install of new lighting control panels in switchgear.
Available fault current labeling required for new panels.
Verify if square D equipment is allowed in Eaton gear.
|
||||
Miscellaneous/Other
Comment Only
04/26/2024
Evaluation of switchboard completed- ok
report attached to permit.
|