Permit Application Status

PREL202401996


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202401996
Electrical
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
ELECTRICAL BUILDOUT & ELECTRICAL MOA FEES.
02/21/2024
02/26/2024
11/20/2024
05/24/2024

Locations

Permits

Permit Number: PREL202401996

Electrical
Finaled
02/26/2024
11/20/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 3/11/2024 (8:00 - 10:00) 3/11/2024 (AM) 03/11/2024
Corrections:


Miscellaneous/Other
Comment Only
03/11/2024
Wall RI back areas - ok Still have front entry and above ceiling. Evaluations maybe required for equipment being installed at a later date.

Electrical Rough-in Inspection Passed 4/10/2024 (8:00 - 10:00) 4/10/2024 (AM) 04/10/2024
Corrections:


Miscellaneous/Other
Comment Only
04/10/2024
Front entry RI - ok

Electrical Rough-in Inspection Partial Pass 4/22/2024 (8:00 - 10:00) 4/22/2024 (AM) 04/22/2024
Corrections:


Miscellaneous/Other
Carried Forward
04/22/2024
Partial above ceilings, in back rooms- ok Entry ceiling required to be cleaned up and wires supported before covering.

Electrical Final Inspection Partial Pass 5/17/2024 (8:00 - 10:00) 5/17/2024 (AM) 05/17/2024
Corrections:


Miscellaneous/Other
Carried Forward
05/17/2024
Temporary final for every area except Studios A,B,C for 6 pieces of equipment in those rooms that will need a third party evaluation or documentation for the electrical equipment in those tables where the general public will be playing the escape game.

Electrical Final Inspection Failed 5/20/2024 (10:00 - 12:00) 5/20/2024 (AM) 05/20/2024
Corrections:


Miscellaneous/Other
Carried Forward
05/20/2024
Temporary final for every area except Studios A,B,C for 6 pieces of equipment in those rooms that will need a third party evaluation or documentation for the electrical equipment in those tables where the general public will be playing the escape game.

Electrical Final Inspection Passed 5/24/2024 (8:00 - 10:00) 5/24/2024 (AM) 05/24/2024
Corrections:


Miscellaneous/Other
Resolved
05/24/2024
Temporary final for every area except Studios A,B,C for 6 pieces of equipment in those rooms that will need a third party evaluation or documentation for the electrical equipment in those tables where the general public will be playing the escape game.

Miscellaneous/Other
Comment Only
05/24/2024
Final- ok Engineers report attached for game show rooms.