PREL202404590
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Pending | |||
Electrical Rough-in Inspection | Partial Pass | 4/30/2024 (10:00 - 12:00) | 4/30/2024 (AM) | 04/30/2024 |
Corrections:
Miscellaneous/Other
Comment Only
04/30/2024
200 amp single phase temporary service for construction trailers N. E. Corner of job site.
There will be a second 200 amp temporary service at a later date on the S. E. Corner of job site.
|
||||
Electrical Rough-in Inspection | Partial Pass | 5/22/2024 (8:00 - 10:00) | 5/22/2024 (AM) | 05/23/2024 |
Corrections:
Miscellaneous/Other
Resolved
05/28/2024
Need available fault currents labeled. To verify equipment ratings.
Service released to Xcel.
|
||||
Electrical Final Inspection | Passed | 5/28/2024 (12:30 - 2:30) | 5/28/2024 (PM) | 05/28/2024 |
Corrections:
Miscellaneous/Other
Comment Only
05/28/2024
South side of job site.
|
||||
Electrical Rough-in Inspection | Partial Pass | 7/30/2024 (2:30 - 3:30) | 7/30/2024 (PM) | 07/30/2024 |
Underground piping | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/30/2024
Need available fault currents labeled. To verify equipment ratings.
Service released to Xcel.
|
||||
Miscellaneous/Other
Comment Only
07/30/2024
Looked at under ground parking garage for temporary power hanging from the columns and some PVC conduits for main power.
Main permit for building was not issued yet.
|