Summary

PREL202404779
Electrical
Finaled
THERMO KING CORPORATION
Alteration/Repair/Replace
180 Day extension granted [bgillespie @ 06/05/2025 1:17 PM] Main gear install: (7) switches (1) main switch (7) sub panels and disconnects Retorque (4) feeders Repair (1) feeder
04/17/2024
04/18/2024
12/20/2025
06/23/2025

Locations

Permits

Permit Number: PREL202404779

Electrical
Finaled
04/18/2024
12/20/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 4/23/2024 (12:30 - 2:30) 4/23/2024 (PM) 04/23/2024
Corrections:


Miscellaneous/Other
Comment Only
04/23/2024
R. I. Underground for 5 inch conduit for 13.8 switch gear.

Electrical Rough-in Inspection Passed 6/23/2025 (8:00 - 10:00) 6/23/2025 (AM) 06/23/2025
Electrical Final Inspection Passed 6/23/2025 (8:00 - 10:00) 6/23/2025 (AM) 06/23/2025
Corrections:


Miscellaneous/Other
Comment Only
06/23/2025
New 13.8kv gear with 7 new disconnects. 4 subs with 3 spare. System checked for proper grounding. Gate around new gear is bonded and has proper clearance. OK