Permit Application Status

PREL202410733


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202410733
Electrical
Finaled
2510 BOATMAN LLC ET AL
Alteration/Repair/Replace
INSTALL 4- 20 AMP 208V SINGLE PHASE DROP CORDS IN ENGINEERING LAB AND BTE REPAIR AREA. INSTALL 2- 30 AMP 208V 3-PHASE DROP CORDS IN SAME.
08/16/2024
08/19/2024
03/10/2025
09/11/2024

Locations

Permits

Permit Number: PREL202410733

Electrical
Finaled
08/19/2024
03/10/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Passed 9/11/2024 (12:30 - 2:30) 9/11/2024 (PM) 09/11/2024