Summary

PREL202501516
Electrical
Permit(s) Issued
CITY OF BLOOMINGTON
Alteration/Repair/Replace
Remodel lighting and switchgear.
02/14/2025
02/24/2025
08/31/2026

Locations

Permits

Permit Number: PREL202501516

Electrical
Issued
02/24/2025
08/31/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
03/04/2026
9-30-25 partial pass of limited access areas. Electrician still has some boxes to blank off and a couple of emerg/exit signs to install. Most of the lights in these areas are installed

Miscellaneous/Other
Outstanding
03/04/2026
Area C: KO plug and cover in Referee Room Upper Area C: Water Cooler GFCI needed Attach 4 square box in Floor hockey area Area D: Blank off 208 volt receptacles-upper level Need lock for Parking lot lighting panel(exposed live wires inside) - Upper level Area E: Zamboni room-Garage Door Opener needs disconnect Roller Door needs disconnect Exterior light 4 square blank Area E Bobcat room-Garage Door Opener needs a disconnect Area E Zamboni repair room: Garage Door Opener needs disconnect Area E tool room: Need KO plug on transformer Zamboni Room #1-missing 4 square blank Zamboni Room #2-Need disconnects for Garage door opener, roller door and heater Mech Room in Area B- heater needs disconnect Area E, 40-3 room--panel clearance still needs to be addressed

Electrical Rough-in Inspection Partial Pass 4/7/2025 (Morning) 4/7/2025 (AM) 04/07/2025
Corrections:


Miscellaneous/Other
Comment Only
04/07/2025
Partial underground

Electrical Rough-in Inspection Partial Pass 5/5/2025 (12:30 - 2:30) 5/5/2025 (PM) 05/05/2025
Corrections:


Miscellaneous/Other
Comment Only
05/05/2025
Underground ri

Electrical Rough-in Inspection Partial Pass 5/12/2025 5/12/2025 (AM) 05/12/2025
Corrections:


Miscellaneous/Other
Comment Only
05/12/2025
Meeting on site

Electrical Rough-in Inspection Partial Pass 5/19/2025 5/19/2025 (PM) 05/19/2025
Corrections:


Miscellaneous/Other
Comment Only
05/19/2025
Meeting on site

Electrical Rough-in Inspection Partial Pass 5/23/2025 5/23/2025 (AM) 05/23/2025
Corrections:


Miscellaneous/Other
Comment Only
05/23/2025
Walk through

Electrical Rough-in Inspection Partial Pass 6/20/2025 (12:30 - 2:30) 6/20/2025 (PM) 06/20/2025
Corrections:


Miscellaneous/Other
Comment Only
06/20/2025
Walkthrough

Electrical Rough-in Inspection Partial Pass 6/26/2025 (8:00 - 10:00) 6/26/2025 (AM) 06/26/2025
Corrections:


Miscellaneous/Other
Comment Only
06/26/2025
Meeting on site

Electrical Rough-in Inspection Partial Pass 7/17/2025 (8:00 - 10:00) 7/17/2025 (AM) 07/17/2025
Corrections:


Miscellaneous/Other
Carried Forward
07/17/2025
Stud wall RI in the following areas ok: A B mezzanine C and D mezzanine.

Electrical Rough-in Inspection Partial Pass 07/24/2025
Corrections:


Miscellaneous/Other
Carried Forward
07/24/2025
Stud wall RI in the following areas ok: A B mezzanine C and D mezzanine.

Miscellaneous/Other
Comment Only
07/24/2025
7-24-25 UG for parking lot poles

Electrical Rough-in Inspection Partial Pass 8/5/2025 (10:00 - 12:00) 8/5/2025 (AM) 08/05/2025
Corrections:


Miscellaneous/Other
Carried Forward
08/05/2025
Stud wall RI in the following areas ok: A B mezzanine C and D mezzanine.

Miscellaneous/Other
Comment Only
08/05/2025
8-5-25 Switchgear and CT cab only From Main breakers in switchgear to sub panels not done

Electrical Rough-in Inspection Partial Pass 9/24/2025 (2:30 - 3:30) 9/24/2025 (PM) 09/24/2025
Corrections:


Miscellaneous/Other
Carried Forward
09/24/2025
Stud wall RI in the following areas ok: A B mezzanine C and D mezzanine.

Miscellaneous/Other
Carried Forward
09/24/2025
Above ceiling- Hallway A and Hallway D and the bathrooms adjacent to these hallways

Electrical Final Inspection Partial Pass 9/30/2025 (12:30 - 2:30) 9/30/2025 (PM) 09/30/2025
Corrections:


Miscellaneous/Other
Carried Forward
09/30/2025
9-30-25 partial pass of limited access areas. Electrician still has some boxes to blank off and a couple of emerg/exit signs to install. Most of the lights in these areas are installed

Electrical Rough-in Inspection Partial Pass 10/30/2025 (10:00 - 12:00) 10/30/2025 (AM) 10/30/2025
Corrections:


Miscellaneous/Other
Carried Forward
10/30/2025
Stud wall RI in the following areas ok: A B mezzanine C and D mezzanine.

Miscellaneous/Other
Carried Forward
10/30/2025
Above ceiling- Hallway A and Hallway D and the bathrooms adjacent to these hallways

Miscellaneous/Other
Comment Only
10/30/2025
10-30-2025 Ceilings-ok Up area B mez concessions offices

Electrical Final Inspection Partial Pass 2/26/2026 (Morning) 2/26/2026 (AM) 02/26/2026
Corrections:


Miscellaneous/Other
Carried Forward
10/30/2025
9-30-25 partial pass of limited access areas. Electrician still has some boxes to blank off and a couple of emerg/exit signs to install. Most of the lights in these areas are installed

Miscellaneous/Other
Comment Only
10/30/2025

Miscellaneous/Other
Outstanding
02/26/2026
2-26-2026 partial Area A Electrical room A- missing some breaker blanks Red breaker locks for 2 FA panels missing Area D Clearance to Electrical panel behind roof access stairs needs to be evaluated. Area B Girls Locker room sign(Jaguars)needs to be powered without an extension cord Water coolers need GFCI protection Also need updated panel schedules

Electrical Final Inspection Partial Pass 3/3/2026 (12:30 - 2:30) 3/3/2026 (PM) 03/04/2026
Corrections:


Miscellaneous/Other
Carried Forward
03/04/2026
9-30-25 partial pass of limited access areas. Electrician still has some boxes to blank off and a couple of emerg/exit signs to install. Most of the lights in these areas are installed

Miscellaneous/Other
Carried Forward
03/04/2026
Area C: KO plug and cover in Referee Room Upper Area C: Water Cooler GFCI needed Attach 4 square box in Floor hockey area Area D: Blank off 208 volt receptacles-upper level Need lock for Parking lot lighting panel(exposed live wires inside) - Upper level Area E: Zamboni room-Garage Door Opener needs disconnect Roller Door needs disconnect Exterior light 4 square blank Area E Bobcat room-Garage Door Opener needs a disconnect Area E Zamboni repair room: Garage Door Opener needs disconnect Area E tool room: Need KO plug on transformer Zamboni Room #1-missing 4 square blank Zamboni Room #2-Need disconnects for Garage door opener, roller door and heater Mech Room in Area B- heater needs disconnect Area E, 40-3 room--panel clearance still needs to be addressed