Permit Application Status

PREL202503041


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202503041
Electrical
Permit(s) Issued
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
Updating track power and lighting, and wire concession building
03/26/2025
04/11/2025
04/04/2026

Locations

Permits

Permit Number: PREL202503041

Electrical
Issued
04/11/2025
04/04/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 7/3/2025 (10:00 - 12:00) 7/3/2025 (AM) 07/03/2025
Corrections:


Miscellaneous/Other
Comment Only
07/03/2025
Underground for track, press box, and concessions pull boxes. High voltage and control circuits separated. - OK Next visit for more underground on lights and power for scoreboard.

Electrical Rough-in Inspection Partial Pass 7/9/2025 (12:30 - 2:30) 7/9/2025 (PM) 07/09/2025
Corrections:


Miscellaneous/Other
Comment Only
07/09/2025
Inspection for underground for new service going in. New 480v panel. New transformer. New 120/240 panel from transformer. Fed from main gear in school that is fused. New service bonded to rebar grid encased in concrete pad.

Electrical Rough-in Inspection Partial Pass 7/17/2025 (10:00 - 12:00) 7/17/2025 (AM) 07/17/2025
Corrections:


Miscellaneous/Other
Comment Only
07/17/2025
Concession Stands ceiling RI - 5 lights 0-10v dimming. 1 Heater. -OK

Electrical Final Inspection Partial Pass 8/21/2025 (2:30 - 3:30) 8/21/2025 (PM) 08/21/2025
Corrections:


Miscellaneous/Other
Comment Only
08/21/2025
Partial Final for Kennedy field. Lights have been wired and are UL compliant. Each pole has its own concrete encased-electrode. - OK Press box is wired with 100 amp sub panel. All receptacles are gfci protected. Concession stand is 95% complete and waiting on water main bonding. Scoreboard is temp wired as new one will not be arriving until October.

Electrical Final Inspection Partial Pass 9/18/2025 (12:30 - 2:30) 9/18/2025 (PM) 09/18/2025
Corrections:


Miscellaneous/Other
Comment Only
09/18/2025
Concession stand final OK Leaving permit open for scoreboard sign coming next month

Electrical Final Inspection Passed 10/6/2025 (10:00 - 12:00) 10/6/2025 (AM) 10/06/2025
Corrections:


Miscellaneous/Other
Comment Only
10/06/2025
Scoreboard for Kennedy high school OK. Properly grounded to beam and ground rod. Transformer is grounded and has disconnect means. Service receptacle installed. This concludes the job