Permit Application Status

PREL202504879


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202504879
Electrical
Finaled
SOUTHTOWN OFFICE PARK LLP
Alteration/Repair/Replace
ADA-compliant door operator installed on the entry door. We will install MC cable from the distribution panel to the door operator using the area above the drop ceiling to route the wiring. A new circuit breaker will be installed in the distribution panel and the wiring will be terminated in the door operator.
05/07/2025
05/08/2025
11/17/2025
05/21/2025

Locations

Permits

Permit Number: PREL202504879

Electrical
Finaled
05/08/2025
11/17/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Passed 5/21/2025 (12:30 - 2:30) 5/21/2025 (PM) 05/21/2025
Electrical Final Inspection Passed 5/21/2025 (12:30 - 2:30) 5/21/2025 (PM) 05/21/2025