PREL202506791
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Passed | 10/14/2025 (8:00 - 10:00) | 10/14/2025 (AM) | 10/14/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/14/2025
New tool install for Skywater.
Tool is hardwired with an internal main breaker for disconnect.
Fed from 75kva transformer which is properly grounded.
Transformer has 100 amp disconnect fused at 80 amps.
|
||||
| Electrical Final Inspection | Passed | 3/12/2026 | 3/12/2026 (AM) | 03/12/2026 |