Permit Application Status

PREL202507249


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202507249
Electrical
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Repair/Replace
Tenant store build out.
06/24/2025
06/27/2025
03/23/2026
09/24/2025

Locations

Permits

Permit Number: PREL202507249

Electrical
Finaled
06/27/2025
03/23/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 7/14/2025 (10:00 - 12:00) 7/14/2025 (AM) 07/14/2025
Corrections:


Miscellaneous/Other
Comment Only
07/14/2025
RI for walls OK 2 new panels going in with transformer. Will need applicable calculations.

Above Ceiling Inspection Passed 7/31/2025 (10:00 - 12:00) 7/31/2025 (AM) 07/31/2025
Corrections:


Miscellaneous/Other
Comment Only
07/31/2025
Above ceiling OK Still waiting on some walls for wires to be routed

Electrical Rough-in Inspection Passed 9/24/2025 (10:00 - 12:00) 9/24/2025 (AM) 09/24/2025
Electrical Final Inspection Partial Pass 9/24/2025 (10:00 - 12:00) 9/24/2025 (AM) 09/24/2025
Corrections:


Miscellaneous/Other
Comment Only
09/24/2025
Final for Columbia OK. All lighting and drivers are UL listed and Class 2 where applicable. Final is contingent on a few photos for panel schedule labeling, a few new receptacles, and store front signage.

Electrical Final Inspection Passed 9/24/2025 (3:30 - 4:00) 9/24/2025 (PM) 09/24/2025
Corrections:


Miscellaneous/Other
Comment Only
09/24/2025
Final for MOA Columbia. Store signs have been installed. All receptacles now installed. Panel is now labeled.