Permit Application Status

PREL202508456


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202508456
Electrical
Permit(s) Issued
THERMO KING CORPORATION
Alteration/Repair/Replace
Add Camlock connection box to existing 200A disconnect.
07/17/2025
07/21/2025
07/27/2026

Locations

Permits

Permit Number: PREL202508456

Electrical
Issued
07/21/2025
07/27/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Final Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
01/28/2026
Information supplied by Electrician on sites indicates a CE listing or a European standards or listing for equipment the Camlock supplies. Need A NRTL listing or a 3rd party listing

Miscellaneous/Other
Outstanding
01/28/2026
Need ballards to protect Electrical equipment associated with the testing trailer and the cables feeding it.

Electrical Final Inspection Failed 8/25/2025 (12:30 - 2:30) 8/25/2025 (PM) 08/26/2025
Corrections:


Miscellaneous/Other
Carried Forward
08/26/2025
Information supplied by Electrician on sites indicates a CE listing or a European standards or listing for equipment the Camlock supplies. Need A NRTL listing or a 3rd party listing

Electrical Final Inspection Failed 1/28/2026 (12:30 - 2:30) 1/28/2026 (PM) 01/28/2026
Corrections:


Miscellaneous/Other
Carried Forward
01/28/2026
Information supplied by Electrician on sites indicates a CE listing or a European standards or listing for equipment the Camlock supplies. Need A NRTL listing or a 3rd party listing

Miscellaneous/Other
Carried Forward
01/28/2026
Need ballards to protect Electrical equipment associated with the testing trailer and the cables feeding it.