PREL202508817
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 8/14/2025 (12:30 - 2:30) | 8/14/2025 (PM) | 08/14/2025 |
|
Corrections:
Miscellaneous/Other
Carried Forward
08/14/2025
Need pics of flush floor feeds that will be drilled through floor
|
||||
|
Miscellaneous/Other
Outstanding
08/19/2025
Will need ceiling inspection
|
||||
| Electrical Rough-in Inspection | Partial Pass | 08/19/2025 | ||
|
Corrections:
Miscellaneous/Other
Resolved
08/19/2025
Need pics of flush floor feeds that will be drilled through floor
|
||||
| Electrical Rough-in Inspection | Passed | 9/25/2025 (8:00 - 10:00) | 9/25/2025 (AM) | 09/25/2025 |
|
Corrections:
Miscellaneous/Other
Outstanding
09/25/2025
Above ceiling-ok 9-25-25
|
||||
| Electrical Final Inspection | Passed | 10/21/2025 (12:30 - 2:30) | 10/21/2025 (PM) | 10/21/2025 |