PREL202509100
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Passed | 8/18/2025 (12:30 - 2:30) | 8/18/2025 (PM) | 08/18/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/18/2025
Ceiling inspection for Haagen Daz. New LED recessed lighting. - Ok
Check disconnect for LED storefront sign on final.
Check Available fault current on final.
|
||||
| Electrical Final Inspection | Partial Pass | 10/29/2025 (8:00 - 10:00) | 10/29/2025 (AM) | 10/29/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/29/2025
Hagen Daz final
Water heater still needs to be wired. Breaker within sight will qualify as disconnect
Signs still need to be installed
Look at translucent menu boards
|
||||
| Electrical Final Inspection | Passed | 11/4/2025 (12:30 - 2:30) | 11/4/2025 (PM) | 11/04/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/04/2025
Water heater wired
signs installed
Menu boards were plug in
|
||||