PREL202509967
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Rough-in Inspection | Failed | 9/3/2025 (10:00 - 12:00) | 9/3/2025 (AM) | 09/03/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/03/2025
338 West Market- Super Neon
- plug strips hanging from ceiling for lighting. Needs dedicated receptacles.
200W and 300W drivers not class 2.
All light fixtures and drivers need UL certification.
Will need a 3rd party engineering report to comply.
No temp CO for now.
|
||||
Electrical Final Inspection | Not Ready | 9/3/2025 (10:00 - 12:00) | 9/3/2025 (AM) | 09/03/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/03/2025
Final not ready. See RI inspection for details.
|
||||
Electrical Final Inspection | Passed | 9/10/2025 (10:00 - 12:00) | 9/10/2025 (AM) | 09/10/2025 |
Corrections:
Miscellaneous/Other
Comment Only
09/10/2025
Final for Super Neon.
All LED drivers class 1 and class 2 are enclosed in a junction box with a cord and plug as a means of disconnect.
A 3rd party evaluation report was done on all drivers and wiring methods. All equipment has stamp of approval from engineer.
|