PREL202510135
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 9/9/2025 (10:00 - 12:00) | 9/9/2025 (AM) | 09/09/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/09/2025
Walls for Pop Mart. - OK
Wires ready for cashwrap.
Will need ceiling inspection.
Water heater being installed.
Existing service equipment. Will need certification.
|
||||
| Electrical Rough-in Inspection | Passed | 9/15/2025 (12:30 - 2:30) | 9/15/2025 (PM) | 09/15/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/15/2025
Ceiling for pop mart - OK
LED recessed lighting and cloud OK
Whips in ceiling for wall casing receptacles to drop down.
|
||||
| Electrical Final Inspection | Partial Pass | 10/22/2025 (12:30 - 2:30) | 10/22/2025 (PM) | 10/22/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/22/2025
TCO on electrical granted for stocking.
5v 40 amp power supplies are non class 2 compliant and a solution is needed to either use them or replace with new product
|
||||
| Electrical Final Inspection | Passed | 10/27/2025 (10:00 - 12:00) | 10/27/2025 (AM) | 10/27/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/27/2025
Final for POP MART OK. All class 2 lighting is contained and properly fused with disconnects.