PREL202511453
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 10/3/2025 (8:00 - 10:00) | 10/3/2025 (AM) | 10/03/2025 |
|
Corrections:
Miscellaneous/Other
Carried Forward
10/03/2025
2 wall RI.-- 1 near bathroom and 1 dividing sales floor with back storage area
|
||||
| Electrical Final Inspection | Partial Pass | 11/4/2025 (12:30 - 2:30) | 11/4/2025 (PM) | 11/04/2025 |
|
Corrections:
Miscellaneous/Other
Carried Forward
11/04/2025
Temp only, need sign installed
|
||||
| Electrical Final Inspection | Passed | 11/24/2025 (10:00 - 12:00) | 11/24/2025 (AM) | 11/24/2025 |
|
Corrections:
Miscellaneous/Other
Outstanding
11/04/2025
Temp only, need sign installed
|
||||