| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Lighting Inspection Sign | Pending | 2/20/2026 | ||
| Electrical Rough-in Inspection | Partial Pass | 12/30/2025 (8:00 - 10:00) | 12/30/2025 (AM) | 12/30/2025 |
|
Corrections:
Miscellaneous/Other
Comment Only
12/30/2025
12-30-2025 walls ok
will need ceiling inspection
Need to look above bathroom for light and fan wiring
|
||||
| Lighting Inspection Sign | Failed | 2/9/2026 | 02/10/2026 | |
| Electrical Rough-in Inspection | Passed | 2/10/2026 (12:30 - 2:30) | 2/10/2026 (PM) | 02/10/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/10/2026
2-10-2026 ceiling -ok
Also looked above hard lid of bathroom. Light and bath exhaust fan ok
|
||||
| Electrical Final Inspection | Passed | 2/10/2026 (12:30 - 2:30) | 2/10/2026 (PM) | 02/10/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/10/2026
Final ok,
Checked GFCI's operation and UL listings of equipment
Bergmann wired new sign to jbox in ceiling but did not install the sign. Sign is UL listed and has a disconnect on the sign.
2 new RTU's, I exhaust fan on roof, Walk in Ref, Walk in freezer
|
||||