Permit Application Status

PREL202600122


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PREL202600122
Electrical
Finaled
OXBORO BLOOMINGTON RETAIL CENTER LLC
Alteration/Repair/Replace
Install electrical system for American Red Cross - Bloomington.
01/06/2026
01/15/2026
10/26/2026
04/29/2026

Locations

Permits

Permit Number: PREL202600122

Electrical
Finaled
01/15/2026
10/26/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Electrical Rough-in Inspection Partial Pass 1/29/2026 (12:30 - 2:30) 1/29/2026 (PM) 01/29/2026
Corrections:


Miscellaneous/Other
Comment Only
01/29/2026
1/29/26 - walls OK Redundancy on grounding for donation area

Electrical Rough-in Inspection Passed 2/17/2026 (8:00 - 10:00) 2/17/2026 (AM) 02/17/2026
Corrections:


Miscellaneous/Other
Comment Only
02/17/2026
2/17/26 - ceiling inspection OK. 2x4 lights supported.

Electrical Final Inspection Partial Pass 3/10/2026 (8:00 - 10:00) 3/10/2026 (AM) 03/10/2026
Corrections:


Miscellaneous/Other
Comment Only
03/10/2026
3/10/26- partial final for space. Phase 1 complete. Start of phase 2 for patient care area.

Underground Electrical Inspection Passed 3/25/2026 (10:00 - 12:00) 3/25/2026 (AM) 03/25/2026
Corrections:


Miscellaneous/Other
Comment Only
03/25/2026
3/25/26 - underground for phase 2, patient care area.

Electrical Rough-in Inspection Passed 3/30/2026 (12:30 - 2:30) 3/30/2026 (PM) 03/30/2026
Corrections:


Miscellaneous/Other
Comment Only
03/30/2026
3/30/26 - RI for phase 2 Red Cross. Nurse stations with receptacles for desktop equipment. These circuits are outside the 6ft patient care zone. Hospital grade receptacles to be installed for cut in receptacles within patient care area. Above ceiling was done also. Small area for bathroom.

Electrical Final Inspection Partial Pass 4/9/2026 (10:00 - 12:00) 4/9/2026 (AM) 04/09/2026
Phase 2-final
Corrections:


Miscellaneous/Other
Comment Only
04/09/2026
4/9/26 - Phase 2 final OK. Nursing stations outside 6ft patient care area. Everything else is hospital grade

Electrical Rough-in Inspection Partial Pass 4/17/2026 (12:30 - 2:30) 4/17/2026 (PM) 04/17/2026
Corrections:


Miscellaneous/Other
Comment Only
04/17/2026
3rd phase of RI-walls ok Hospital grade MC present in bed areas Ice machine will have a GFCI breaker Will need ceiling RI

Above Ceiling Inspection Passed 4/21/2026 (12:30 - 2:30) 4/21/2026 (PM) 04/21/2026
Corrections:


Miscellaneous/Other
Comment Only
04/21/2026
4/21/26 - above ceiling OK. Phase 3

Electrical Rough-in Inspection Passed 4/29/2026 (10:00 - 12:00) 4/29/2026 (AM) 04/29/2026
Electrical Final Inspection Passed 4/29/2026 (10:00 - 12:00) 4/29/2026 (AM) 04/29/2026
Corrections:


Miscellaneous/Other
Comment Only
04/29/2026
4/29/26 - Final for Red Cross. GFCI protection installed for ice maker and refrigerator/ countertop receptacles near water sources. All receptacles within 6ft of patient care areas are hospital grade.

Miscellaneous/Other
Comment Only
04/29/2026
4/29/26 - Final for all phases of project complete