PREL202601156
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Electrical Rough-in Inspection | Partial Pass | 2/26/2026 (8:00 - 10:00) | 2/26/2026 (AM) | 02/26/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/26/2026
2/26/26 - RI on half wall OK. Check all dedicated circuits for coffee machines.
Check for GFCI protection where needed
Check machine listings come final.
|
||||
| Electrical Rough-in Inspection | Passed | 3/5/2026 (12:30 - 2:30) | 3/5/2026 (PM) | 03/05/2026 |
| Electrical Final Inspection | Passed | 3/5/2026 (12:30 - 2:30) | 3/5/2026 (PM) | 03/05/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/05/2026
3/5/26 - Final for coffee shop. All single phase and three phase cord and plug equipment is ground fault protected at the breaker.
Equipment is listed for use
Signs installed. cord and plug.
|
||||