PRFD201711992
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Building Final Inspection | Pending | |||
Footing Inspection | Pending | |||
Footing Inspection | Partial Pass | 6/25/2018 (8:00 - 10:00) | 6/25/2018 | 06/25/2018 |
Corrections:
Miscellaneous/Other
Comment Only
06/25/2018
grade beam strip footing from grid 26.8 to K9, grid 34 & H at 34, grid 41 to 6.3.
Approved for concrete.
|
||||
Footing Inspection | Partial Pass | 7/2/2018 (8:00 - 10:00) | 7/2/2018 | 07/02/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/02/2018
Footings and rebar at grid line D1, 37- 22.5. Approved for concrete.
|
||||
Footing Inspection | Partial Pass | 7/9/2018 (2:30 - 3:30) | 7/9/2018 | 07/09/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/09/2018
Rebar and footing at grids... A.7 from 1.8-22.5 east side. West side grid, k.9 from 22.5-7.9.
Approved for concrete.
|
||||
Footing Inspection | Partial Pass | 7/17/2018 (8:00 - 10:00) | 7/17/2018 | 07/17/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/17/2018
Remaining perimeter footings of building, and the 2 elevator pits. Approved for concrete. R10 foam insulation at perimeter of building foundation of the already placed walls, approved.
|
||||
Footing Inspection | Partial Pass | 7/23/2018 (8:00 - 10:00) | 7/23/2018 | 07/23/2018 |
Corrections:
Miscellaneous/Other
Comment Only
07/23/2018
Footing at grid Lin’s 15*9-17.9 at outside of building perimeter. Column at J.5 and 17.9. All remaining columns at upside of building perimeter on east side of building.
Approved for concrete.
|