PRFD201805372
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Footing Inspection | Partial Pass | 8/27/2018 (12:30 - 2:30) | 8/27/2018 | 08/27/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/27/2018
Perimeter footings... North side, west side, and south side up to grid line āDā. Approved for concrete placement.
|
||||
Footing Inspection | Partial Pass | 8/29/2018 (12:30 - 2:30) | 8/29/2018 | 08/29/2018 |
Corrections:
Miscellaneous/Other
Comment Only
08/29/2018
2- f-9 pads, 1-f/6 pad, the remaining strip footings on south side perimeter, and 3/4 of the perimeter footings on east side.
Elevator pad is being lined with membrane, rebar is as per plan. The drain being used is a side wall drain and will be installed with the wall sections.
Approx 1/4 of east perimeter footing that ties to the north perimeter footing is remaining to be set with the next pour.
|
||||
Footing Inspection | Passed | 8/30/2018 (12:30 - 2:30) | 8/30/2018 | 08/30/2018 |
Moved 08/28/2018 inspection to 08/30/2018 per contractor - rained out. Emailed Jon and called. ajacobson 08/28/2018 8:29 AM | ||||
Corrections:
Miscellaneous/Other
Comment Only
08/30/2018
Remaining strip footing on east side, and the last four pad footings. Pier by elevator pad and 2 stem walls on north footing .... all approved for concrete.
|
||||
Progress Inspection | Partial Pass | 9/26/2018 (12:30 - 2:30) | 9/26/2018 | 09/26/2018 |
Corrections:
Miscellaneous/Other
Comment Only
09/26/2018
Rebar in place for the masonry walls of elevator . Approved.
|
||||
Building Final Inspection | Passed | 7/23/2019 | 9/30/2019 (PM) | 07/23/2019 |
07/23/2019: Finalled on 7/23/19 per Jon Aaron. dheile 09/30/2019 12:36 PM | ||||
Corrections:
Miscellaneous/Other
Comment Only
07/23/2019
This portion of the work is completed, see permit 201810629 for remaining inspections with this new build.
|