PRFD201815193
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Electrical Final Inspection | Pending | |||
Footing Inspection | Partial Pass | 5/1/2019 (12:30 - 2:30) | 5/1/2019 (PM) | 05/01/2019 |
Progress - Geopier soil correction prior to concrete reinforced footings. A. Braun on site for special inspections. | ||||
Footing Inspection | Partial Pass | 5/7/2019 (10:00 - 12:00) | 5/7/2019 (AM) | 05/07/2019 |
Footings per plan - A. VIBRATE CONCRETE - VERBAL ORDER. B. ALL FOOTING PERIMITER AND 5 CENTER PAD FOOTINGS FOR REINFORCEMENT AND SIZE - APPROVED C. BALANCE REMAINING - 2-3 INTERIOR PADS, AND JOINING NEW STRIP FOOTING ON SOUTH WEST INTO EXISTING BUILDING. D. CALL FOR REINSPECTION E. NO UFER GROUND PROVIDED BY CONTRACTOR, USING EXISTING BUILDING ELECTRICAL POWER. E. Pour at your own risk. No soil reports on site from Braun, and no Braun reinforcement report left on site today. | ||||
Footing Inspection | Passed | 5/15/2019 (10:00 - 12:00) | 5/15/2019 (AM) | 05/15/2019 |
Poured walls, soon walls, balance of all piers with bolt sets at piers ready to pour. A. Braun Intertec on site. | ||||
Corrections:
Miscellaneous/Other
Comment Only
05/15/2019
Poured walls on new footings and balance of piers and pads.
A. Vibrator on site. B. 4000 psi mix design per plan. Pumping concrete. C. Braun Intertec on site. D. Steel reinforcing in place.
|
||||
Building Final Inspection | Passed | 04/28/2020 | ||
NEED BRAUN INTERTEC AND ALL OTHER SPECIAL INSPECTION SUMMARY REPORTS.,SOIL REPORTS, CONCRETE REPORTS. Report from Braun Intertec received, per B. Post. |