Permit Application Status

PRFD201900758


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFD201900758
Foundation
Finaled
SKYWATER TECH FOUNDRY INC
Alteration/Repair/Replace
Not Required
New monument sign
01/23/2019
03/22/2019
02/19/2020
08/23/2019

Locations

Permits

Permit Number: PRFD201900758

Foundation
Finaled
03/22/2019
02/19/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Passed w/ Conditions 8/23/2019 (8:00 - 10:00) 8/23/2019 (AM) 08/23/2019
Corrections:


Miscellaneous/Other
Comment Only
08/23/2019
This sign was installed prior to any permit being issued and no footing inspection was ever done or attempted to be called in for. Unable to verify what was installed for footing or if it is per the design. It appears this sign is also moved farther back than what the site plans show, but there also appears to be no easement encroachment issues. The city takes no stance as to this footing installation and any liability is to the installer if any issues arise due to footing install without inspection.

Building Final Inspection Passed w/ Conditions 8/23/2019 (8:00 - 10:00) 8/23/2019 (AM) 08/23/2019
Corrections:


Miscellaneous/Other
Comment Only
08/23/2019
See notes for footing inspection. This sign was installed prior to any permit being issued or inspections being performed. The sign location is set back farther than what is shown on the site plan, but appears to not encroach any setbacks. Sign is in place and all plantings are in ground. This is a conditional final to close permit, the installer take on any liability for placement and installation of sign with no inspections performed by city as required.