Permit Application Status

PRFD202209299


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFD202209299
Foundation
Finaled
NOBLE APARTMENTS LLC
Other
Not Required
Footings and Foundation for Noble Apartments
07/27/2022
08/04/2022
08/26/2024
02/28/2024

Locations

Permits

Permit Number: PRFD202209299

Foundation
Finaled
08/04/2022
08/26/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Footing Inspection Partial Pass 8/19/2022 (8:00 - 10:00) 8/19/2022 (AM) 08/19/2022
First footing pour - Progress inspection - passed. A. TR concrete and masonry company. Special inspections on site. Note - Ongoing inspections. (AET SPECIAL INSPECTIONS.)
Footing Inspection Not Ready 8/24/2022 (12:30 - 2:30) 8/24/2022 (PM) 08/24/2022
Cancelled inspection.
Footing Inspection Not Ready 8/24/2022 (10:00 - 12:00) 8/24/2022 (AM) 08/24/2022
Footing Inspection Partial Pass 8/25/2022 (12:30 - 2:30) 8/25/2022 (PM) 08/25/2022
On going inspections - 2nd pour. Passed.
Footing Inspection Partial Pass 8/31/2022 (12:30 - 2:30) 8/31/2022 (PM) 08/31/2022
On going footings. Passed. A. Update-2 elevator drains, 1 drain for each elevator. 4 inch diameter drain pipe.
Corrections:


Strip footings and pad footings per approved drawings on sandy soil-OK
Comment Only
08/31/2022
2nd footing inspection today. Strip footings and pad footings per approved drawings on sandy soil-OK

Footing Inspection Partial Pass 9/2/2022 (10:00 - 12:00) 9/2/2022 (AM) 09/02/2022
Corrections:


Miscellaneous/Other
Comment Only
09/02/2022
Elevator pad,footings,and pads, at lines 9 to 10 and grids C to D… approved for concrete placement.

Footing Inspection Partial Pass 09/09/2022
Corrections:


Miscellaneous/Other
Comment Only
09/09/2022
Progress inspection - site visit for progress.

Progress Inspection Partial Pass 09/09/2022
Progress - footings, block work, bentonite membrain for 2 elevator footings.
Footing Inspection Partial Pass 9/12/2022 (12:30 - 2:30) 9/12/2022 (PM) 09/12/2022
On going reinforced foundation footings and pads.
Progress Inspection Partial Pass 09/14/2022
Elevator foundation walls, poured reinforced concrete per plan. A. Must be inspected and passed, by special inspections. A. Provide a minimum 20 ft, #4, rebar for grounding, laid in sandy soil, or embedded in poured concrete footing. B. General Contractor has consulted with electrical contractor for this project, J BERG electrical Co.
Corrections:


Miscellaneous/Other
Comment Only
09/14/2022
Bonding/ground. A. Provide a minimum of one #4 rebar, laid in sand, with 90 degree bend for the 2 elevators. B. Ground Location to be exterior of the elevator foundation walls.

Progress Inspection Partial Pass 09/16/2022
Progress inspection. A. foundation CMU, and waterproofing progress.
Footing Inspection Partial Pass 9/20/2022 (12:30 - 2:30) 9/20/2022 (PM) 09/20/2022
Special inspections AET. James Essex.
Corrections:


Miscellaneous/Other
Comment Only
09/20/2022
Special inspections on site - AET Balance of Pad footings-south east end of building.

Building Final Inspection Partial Pass 12/08/2022
Progress: Precast plank for main floor above underground parking ramp.
Footing Inspection Partial Pass 8/19/2022 (8:00 - 10:00) 02/28/2024
Ongoing footing inspections. Special inspections - AET.
Footing Inspection Passed 02/28/2024
Footing and foundation final. AET ST PAUL. Special inspections.
Footing Inspection Passed 02/28/2024
Start of building foundation. Foundation completed.
Building Final Inspection Passed 02/28/2024