Permit Application Status

PRFD202400163


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFD202400163
Foundation
Finaled
CITY OF BLOOMINGTON
Other
Not Required
Footing and foundation permit application for a 128-unit apartment building. The foundation/underground parking garage is constructed of CIP concrete walls and PT slab on first floor. There is small area above the first floor which has CIP columns and PT slab as well.
01/04/2024
10/30/2024
09/09/2025

Locations

Permits

Permit Number: PRFD202400163

Foundation
Finaled
10/30/2024
09/09/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending 3/14/2025 (10:00 - 12:00)
Footing Inspection Passed 12/4/2024 (10:00 - 12:00) 12/4/2024 (AM) 12/04/2024
Corrections:


Miscellaneous/Other
Comment Only
12/04/2024
East elevator and footing pads within grids D1 to E1, and lines 10 to 11. West elevator and footing pads within grids D.6 to E.5, lines 3 to 4

Footing Inspection Passed 12/6/2024 (10:00 - 12:00) 12/6/2024 (AM) 12/06/2024
Corrections:


Miscellaneous/Other
Comment Only
12/06/2024
Walls at both elevators and columns to the footings placed at inspection done on 12/4/24. Pad footings and columns on line 5, grids D.4 & E.1

Footing Inspection Passed 12/10/2024 (10:00 - 12:00) 12/10/2024 (AM) 12/10/2024
Corrections:


Miscellaneous/Other
Comment Only
12/10/2024
2 pad footings on line 5, grids E.1 and D.1 Perimeter strip footing at grids A.1 & A.2, from lines 4.5 to 8.

Footing Inspection Passed 12/11/2024 (10:00 - 12:00) 12/11/2024 (AM) 12/11/2024
Corrections:


Miscellaneous/Other
Comment Only
12/11/2024
4 pad footings at grid E.5, lines 6,7,8,& 9 Columns at grid E.5 line 6 Grid E.1, lines 10.6 & 11.1

Footing Inspection Not Ready 12/12/2024 (10:00 - 12:00) 12/12/2024 (AM) 12/12/2024
Cancelled by contractor for today. Text to inspector. [jsmidt @ 12/12/2024 8:12 AM]
Corrections:


Miscellaneous/Other
Comment Only
12/12/2024
Inspection canceled by contractor due to weather.

Footing Inspection Partial Pass 12/16/2024 (10:00 - 12:00) 12/16/2024 (AM) 12/16/2024
4 reinforced poured concrete columns, on new footing, at line E.1, grid line, 7,8,9,10. Passed. Temp 36 degree F.
Footing Inspection Passed 12/17/2024 (10:00 - 12:00) 12/17/2024 (AM) 12/17/2024
Corrections:


Miscellaneous/Other
Comment Only
12/17/2024
3 interior pads at grid D.1, lines 7,8,&,9 Exterior strip footing and pads at grid B.7, lines 8 to 16 and line 16 from B.7 to E.8, and line 17, E8 to G.2

Footing Inspection Passed 12/18/2024 (10:00 - 12:00) 12/18/2024 (AM) 12/18/2024
Corrections:


Miscellaneous/Other
Comment Only
12/18/2024
Correction of grid line from yesterday's inspection. Strip footing on grid A.3 from lines 8-16. Today's inspection... Columns on grid E.1, lines 7,8,&9 Pad footings on grid B.1, lines 5,6,&7

Footing Inspection Not Ready 12/19/2024 (10:00 - 12:00) 12/19/2024 (AM) 12/19/2024
Corrections:


Miscellaneous/Other
Comment Only
12/19/2024
Canceled by contractor due to weather

Footing Inspection Passed 12/20/2024 (10:00 - 12:00) 12/20/2024 (AM) 12/20/2024
Corrections:


Miscellaneous/Other
Comment Only
12/20/2024
Strip footing section and pad at line 17 SE corner. Wall section at line 16 and 2 columns. Continuing wall section at grid A.3. 150 ft of drain tile at NE footing.

Footing Inspection Passed 12/23/2024 (10:00 - 12:00) 12/23/2024 (AM) 12/23/2024
Corrections:


Miscellaneous/Other
Comment Only
12/23/2024
Remaining wall section at grid A.3 to line 16. Wall section at line 16, A.3 to C.4. Column at line 16, grid E.3 Water proofing and insulation for foundation is in process of install to finished foundation wall on A.3.

Footing Inspection Passed 12/30/2024 (10:00 - 12:00) 12/30/2024 (AM) 12/30/2024
Corrections:


Miscellaneous/Other
Comment Only
12/30/2024
Column on grid B.3, line 9.1 Column on grid B.1, line 8

Footing Inspection Passed 12/31/2024 (10:00 - 12:00) 12/31/2024 (AM) 12/31/2024
Corrections:


Miscellaneous/Other
Comment Only
12/31/2024
Wall section on line 16, grid A.3 to approximately E.3 Walls between grids 11.6 to 14.3, off grid F.8 Column on F.8, line 14

Footing Inspection Passed 1/2/2025 (10:00 - 12:00) 1/2/2025 (AM) 01/02/2025
Corrections:


Miscellaneous/Other
Comment Only
01/02/2025
3 pads... grid C.1, lines 7,8,& 9 Wall section on line 16, from grids A.3 to E.8

Footing Inspection Passed 1/3/2025 (10:00 - 12:00) 1/3/2025 (AM) 01/03/2025
Corrections:


Miscellaneous/Other
Comment Only
01/03/2025
3 columns at grid C.1, lines 7,8,&9

Footing Inspection Passed 1/6/2025 (10:00 - 12:00) 1/6/2025 (AM) 01/06/2025
Corrections:


Miscellaneous/Other
Comment Only
01/06/2025
Draintile at footings of lines 16 & 17, and G.1 & G.2 of already poured footings of this line. Rebar of walls on line 17, E.8 to G.2,and at G.2 to line 12

Footing Inspection Passed 1/7/2025 (10:00 - 12:00) 1/7/2025 (AM) 01/07/2025
Corrections:


Miscellaneous/Other
Comment Only
01/07/2025
4 pads on grid B.3, lines 10.8, 11.7, 13.5, & 15 4 columns on line 16, grids C.4, D.2, E.3, & E.8 Wall sections on grid G.2 from lines 10-12 approved pending the rebar installation to tie walls together at at jog on line 11.

Footing Inspection Passed 1/8/2025 (10:00 - 12:00) 1/8/2025 (AM) 01/08/2025
Corrections:


Miscellaneous/Other
Comment Only
01/08/2025
4 columns on footing pads at grid B.3, lines 0.811.7,13.5 & 15 Pads footing and wall footings at and between lines 12.1 to 13.2, and at and between grids D.2 and E.3. Footing pad at grid E.3, line 11.6

Footing Inspection Not Ready 1/9/2025 (10:00 - 12:00) 1/9/2025 (AM) 01/09/2025
Corrections:


Miscellaneous/Other
Comment Only
01/09/2025
No footings or concrete pours today, set up for pads and columns is taking place for tomorrow.

Footing Inspection Passed 1/10/2025 (10:00 - 12:00) 1/10/2025 (AM) 01/10/2025
Corrections:


Miscellaneous/Other
Comment Only
01/10/2025
4 pad footings.... line 14.3, grids D.2 & E.3 Grid F.3, lines 12 & 14 Columns... Grid C.3, lines 14.3,13,11.5, & 10.9 Grid D.2, lines 12.1 & 13.2 Grid E.3, lines 13.2 & 11.6 Line 17, grids F.4 & F.8 Line 12, grid F.8

Footing Inspection Not Ready 1/13/2025 (10:00 - 12:00) 1/13/2025 (AM) 01/13/2025
Corrections:


Miscellaneous/Other
Comment Only
01/13/2025
Not ready for any footings to be inspected today, backfill is being done at this time.

Footing Inspection Passed 1/16/2025 (10:00 - 12:00) 1/16/2025 (AM) 01/16/2025
Corrections:


Miscellaneous/Other
Comment Only
01/16/2025
Columns on pads located at line 14.3, grids D.2 & E.3 and grid F.3, lines 12 & 14 Wall section at grids G.1 & G.2 to approximately grid 8

Footing Inspection Not Ready 1/17/2025 (10:00 - 12:00) 1/17/2025 (AM) 01/17/2025
Corrections:


Miscellaneous/Other
Comment Only
01/17/2025
Not ready for inspection. Contractor has not started any walls or footings yet.

Footing Inspection Not Ready 1/21/2025 (10:00 - 12:00) 1/21/2025 (AM) 01/21/2025
Corrections:


Miscellaneous/Other
Comment Only
01/21/2025
Not ready for inspection due to weather delay

Footing Inspection Passed 1/22/2025 (10:00 - 12:00) 1/22/2025 (AM) 01/22/2025
Corrections:


Miscellaneous/Other
Comment Only
01/22/2025
Pad footings on grid F.3, lines 10&11 Pad footings on grid F.1, lines 8&9

Footing Inspection Passed 1/23/2025 (10:00 - 12:00) 1/23/2025 (AM) 01/23/2025
Corrections:


Miscellaneous/Other
Comment Only
01/23/2025
Columns in grid F.3, lines 10 & 11 Grid F.1, lines 9&8 Grid F.8, line 11

Footing Inspection Passed 1/24/2025 (10:00 - 12:00) 1/24/2025 (AM) 01/24/2025
Corrections:


Miscellaneous/Other
Comment Only
01/24/2025
Strip footing on grid G.1, from lines 4-8 Pad footings ongrid F.2, lines 4,5,6,& 7

Footing Inspection Passed 1/27/2025 (10:00 - 12:00) 1/27/2025 (AM) 01/27/2025
Corrections:


Miscellaneous/Other
Comment Only
01/27/2025
Rebar for T/slab off grid G.2, lines 13.5-14.3

Footing Inspection Passed 1/28/2025 (10:00 - 12:00) 1/28/2025 (AM) 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
Perimeter strip footing line 1, from grids F.1 to G.1 Perimeter strip footing on grid G.1, from lines 1-3 Rebar for poured wall on grid G.1, lines 5-8 Pad footing on grid C.1, line 6 Pad footings on grid F.2, lines 2&3

Footing Inspection Passed 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
4 columns on grid F.1, lines 4,5,6,7

Footing Inspection Not Ready 1/29/2025 (10:00 - 12:00) 1/29/2025 (AM) 01/29/2025
Corrections:


Miscellaneous/Other
Comment Only
01/29/2025
Not ready for inspection today.

Footing Inspection Passed 1/30/2025 (10:00 - 12:00) 1/30/2025 (AM) 01/30/2025
Corrections:


Miscellaneous/Other
Comment Only
01/30/2025
Pad footings on grids F.2 and E.2 at line 2 Pad footings on grid C.1, lines 4&5 Columns on grid C.1, lines 1&2 Wall section on grid A.1, from lines 4-5 Progress of first deck pour set up is still ongoing, stud rails and head steel in place, E/W cables in place and per drawing.

Footing Inspection Passed 1/31/2025 (10:00 - 12:00) 1/31/2025 (AM) 01/31/2025
Corrections:


Miscellaneous/Other
Comment Only
01/31/2025
6 columns... Grids C.1 & C.2 , lines 2,3,4,5,6 Grid E.1 line 2

Footing Inspection Passed 2/3/2025 (10:00 - 12:00) 2/3/2025 (AM) 02/03/2025
Corrections:


Miscellaneous/Other
Comment Only
02/03/2025
Looked over the progress of the first PT deck pour multiple times as all cables and rebar was being placed. Special inspector saw all of the compnents for this pour going in place and rechecked it prior to the concrete placement that is now taking place.... first deck pour approved

Footing Inspection Not Ready 2/4/2025 (10:00 - 12:00) 2/4/2025 (AM) 02/04/2025
Corrections:


Miscellaneous/Other
Comment Only
02/04/2025
Not ready for inspection today.

Footing Inspection Not Ready 2/5/2025 (10:00 - 12:00) 2/5/2025 (AM) 02/05/2025
Corrections:


Miscellaneous/Other
Comment Only
02/05/2025
Not ready for inspection

Footing Inspection Passed 2/6/2025 (10:00 - 12:00) 2/6/2025 (AM) 02/06/2025
Corrections:


Miscellaneous/Other
Comment Only
02/06/2025
Wall sections... line 1, grid G.1 to F.2 and lines 1-3 on grid G.1

Footing Inspection Not Ready 2/10/2025 (10:00 - 12:00) 2/10/2025 (AM) 02/10/2025
Corrections:


Miscellaneous/Other
Comment Only
02/10/2025
2nd PT deck is still in process of setup, not quite ready for inspection.

Footing Inspection Partial Pass 2/11/2025 (10:00 - 12:00) 2/11/2025 (AM) 02/11/2025
Corrections:


Miscellaneous/Other
Comment Only
02/11/2025
Second PTdeck sectionis stillin progress of setup. Counted cable numbers, and sttel at columns. This deck will need to be inspected by the third party inspector when finished and ready for concrete placement.

Footing Inspection Partial Pass 2/12/2025 (10:00 - 12:00) 2/12/2025 (AM) 02/12/2025
Ongoing foundation inspections. New concrete Footings, and New cast in place post tension floor, for underground parking. Ongoing special inspections. (Provide all special inspections reports) to Jon Aaron Building inspector, and Kelly Byers, plan reviewer.
Footing Inspection Passed 2/14/2025 (10:00 - 12:00) 2/14/2025 (AM) 02/14/2025
Corrections:


Miscellaneous/Other
Comment Only
02/14/2025
Strip footing with pad and column steel. Grid A.2 lines 1 to 3.5 tying into already places footing. Line 1, grids F.1 to A.2 Pads on grid B.2, lines 2 & 3

Footing Inspection Not Ready 2/18/2025 (10:00 - 12:00) 2/18/2025 (AM) 02/18/2025
Corrections:


Miscellaneous/Other
Comment Only
02/18/2025
Due to extreme temps, no set up has been done.... not ready for inspection.

Footing Inspection Not Ready 2/19/2025 (10:00 - 12:00) 2/19/2025 (AM) 02/19/2025
Corrections:


Miscellaneous/Other
Comment Only
02/19/2025
Inspection canceled by contractor

Footing Inspection Not Ready 2/20/2025 (10:00 - 12:00) 2/20/2025 (AM) 02/20/2025
Corrections:


Miscellaneous/Other
Comment Only
02/20/2025
Not ready for today's inspection

Footing Inspection Passed 2/21/2025 (10:00 - 12:00) 2/21/2025 (AM) 02/21/2025
Corrections:


Miscellaneous/Other
Comment Only
02/21/2025
Wall rebar at line 1, grids C.2 to F.2... approved

Footing Inspection Not Ready 2/24/2025 (10:00 - 12:00) 2/24/2025 (AM) 02/24/2025
Corrections:


Miscellaneous/Other
Comment Only
02/24/2025
No new rebar to be inspected today, what is being poured has already been inspected.

Footing Inspection Passed 2/25/2025 (10:00 - 12:00) 2/25/2025 (AM) 02/25/2025
Corrections:


Miscellaneous/Other
Comment Only
02/25/2025
All columns at PT deck of area 1. Area 3 PT deck. Wall rebar at line 1, grids C.2 to A.2 and section of rebar on A.2 grid 1

Footing Inspection Not Ready 2/26/2025 (10:00 - 12:00) 2/26/2025 (AM) 02/26/2025
Corrections:


Miscellaneous/Other
Comment Only
02/26/2025
Not ready for inspection today, deck stressing isin process.

Footing Inspection Passed 2/27/2025 (10:00 - 12:00) 2/27/2025 (AM) 02/27/2025
Corrections:


Miscellaneous/Other
Comment Only
02/27/2025
Viewed columns at grid B.2 of lines 2&3 And in wall columns on gris A.2, off lines 2&3. Wall rebar is still in progress of being tied and set.

Footing Inspection Not Ready 2/28/2025 (10:00 - 12:00) 2/28/2025 (AM) 03/03/2025
Progress Inspection Not Ready 3/3/2025 (10:00 - 12:00) 3/3/2025 (AM) 03/03/2025
Corrections:


Miscellaneous/Other
Comment Only
03/03/2025
Assembly of deck for next PT pour, not ready for inspection today.

Progress Inspection Passed 3/4/2025 (10:00 - 12:00) 3/4/2025 (AM) 03/04/2025
Corrections:


Miscellaneous/Other
Comment Only
03/04/2025
Deck is still in process of setup for the next PT pour, what rebar and cables that are in place is per the plans.

Progress Inspection Not Ready 3/5/2025 (10:00 - 12:00) 3/5/2025 (AM) 03/05/2025
Corrections:


Miscellaneous/Other
Comment Only
03/05/2025
Not ready for inspection

Progress Inspection Not Ready 3/6/2025 (12:30 - 2:30) 3/6/2025 (PM) 03/06/2025
Corrections:


Miscellaneous/Other
Comment Only
03/06/2025
Not ready for inspection, delay due to weather cleanup.

Footing Inspection Passed 03/07/2025
Corrections:


Miscellaneous/Other
Comment Only
03/07/2025
4th PT deck is mostly completed, approval to pour concret hinges on special insp and verification of the remaining steel to be placed where needed and wrapping of exposed cables , along with deck cleanup.

Progress Inspection Not Ready 3/10/2025 (10:00 - 12:00) 3/10/2025 (AM) 03/10/2025
Corrections:


Miscellaneous/Other
Comment Only
03/10/2025
Pouring concrete for the PT deck, no other inspection is needed quite yet.

Progress Inspection Not Ready 3/11/2025 (10:00 - 12:00) 3/11/2025 (AM) 03/11/2025
Corrections:


Miscellaneous/Other
Comment Only
03/11/2025
Inspection not needed today

Progress Inspection Not Ready 3/12/2025 (10:00 - 12:00) 3/12/2025 (AM) 03/12/2025
Progress Inspection Passed 3/13/2025 (10:00 - 12:00) 3/13/2025 (AM) 03/13/2025
Corrections:


Miscellaneous/Other
Comment Only
03/13/2025
Not ready for inspection of PT deck. Consult with framing contractor on inspections. Went over inspections and other questions that were asked pertaining to this project.