PRFD202405009
Foundation
Expired
SICK PRODUCT & COMPETENCE CENTER AMERICAS LLC
Other
Not Required
The Project consists of a new construction of a 140,000 sq.ft. office building, including office space for up to 385 employees, with lab spaces for product development, testing, and customer interaction; a training and resource center for customers, visitors and SICK employees; along with various employee and guest amenities. Project includes a glazed skyway link building connecting the Phase 1 and Phase 2 buildings and associated site development and landscaping. Full Parking Structure Permit under PRBD202402359
04/22/2024
05/10/2024
04/28/2025

Locations

Permits

Permit Number: PRFD202405009

Foundation
Expired
05/10/2024
04/28/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Pending
Footing Inspection Passed 5/15/2024 (12:30 - 2:30) 5/15/2024 (PM) 05/15/2024
Corrections:


Miscellaneous/Other
Comment Only
05/15/2024
Perimeter strip footings with integrated pads from line 7, around to approximately grid C.5 Pad footing with integrated pad for crane placement at line 4 and grid E. Approved for concrete placement.

Footing Inspection Passed 5/17/2024 (8:00 - 10:00) 5/17/2024 (AM) 05/17/2024
Corrections:


Miscellaneous/Other
Comment Only
05/17/2024
Perimeter footings and integrated pads at line 1, grids C.5 to F. Line 1, grid F to H line 1.7 from grids H to J. Grid J, line1.7 to 2.3. Approved for concrete placement.

Footing Inspection Not Ready 5/21/2024 (12:30 - 2:30) 5/22/2024 (PM) 05/22/2024
Corrections:


Miscellaneous/Other
Comment Only
05/22/2024
Today's inspection was canceled by contractor, these footings will be inspected with the next set of footings on 5/23/24.

Footing Inspection Passed 5/23/2024 (12:30 - 2:30) 5/23/2024 (PM) 05/23/2024
Corrections:


Miscellaneous/Other
Comment Only
05/23/2024
Perimeter foundation wall on the footings previously inspected from grid B , around to grids H &J to line 2. Line H to J around to line 2. Approved for concrete placement.

Footing Inspection Not Ready 5/24/2024 (8:00 - 10:00) 5/24/2024 (AM) 05/24/2024
Corrections:


Miscellaneous/Other
Comment Only
05/24/2024
Inspection canceled due to rain, no concrete being placed.

Footing Inspection Passed 5/30/2024 (8:00 - 10:00) 5/30/2024 (AM) 05/30/2024
Corrections:


Miscellaneous/Other
Comment Only
05/30/2024
Footings at loading dock ramp between lines 5 to 8. Grid "A" from lines 7-9. Pad footing on line 6 , grad E

Footing Inspection Passed 5/31/2024 (12:30 - 2:30) 5/31/2024 (PM) 05/31/2024
Corrections:


Miscellaneous/Other
Comment Only
05/31/2024
Wall rebar from grid H to J and around to line 2.3. 4 piers on grid B, lines 2.6,3.4,& 5 Approved

Footing Inspection Passed 6/3/2024 (12:30 - 2:30) 6/3/2024 (PM) 06/03/2024
Corrections:


Miscellaneous/Other
Comment Only
06/03/2024
Pouring column bases at lines 6&7, grids D&E. Line 1, grids D&E

Footing Inspection Passed 6/4/2024 (12:30 - 2:30) 6/4/2024 (PM) 06/04/2024
Corrections:


Miscellaneous/Other
Comment Only
06/04/2024
Column bases grid C, lines 2 & 2.3 And column bases at grid J, lines 2 & 2.3 Rebar in loading dock wall is still ongoing, with mostly the upper section of wall to be tied in place.

Footing Inspection Not Ready 6/5/2024 (12:30 - 2:30) 6/5/2024 (PM) 06/05/2024
Corrections:


Miscellaneous/Other
Comment Only
06/05/2024
Not ready for inspection today.

Footing Inspection Passed 6/6/2024 (12:30 - 2:30) 6/6/2024 (PM) 06/06/2024
Corrections:


Miscellaneous/Other
Comment Only
06/06/2024
Elevator pad between grids E & F, lines 2.3 & 3.... approved for concrete placement

Footing Inspection Passed 6/7/2024 (12:30 - 2:30) 6/7/2024 (PM) 06/07/2024
Corrections:


Miscellaneous/Other
Comment Only
06/07/2024
Rebar in Foundation walls for loading dock ramp.... approved for concrete placement.

Footing Inspection Passed 6/10/2024 (12:30 - 2:30) 6/10/2024 (PM) 06/10/2024
Corrections:


Miscellaneous/Other
Comment Only
06/10/2024
Partial Walls at singlr car elevator between lines 6&7, grids D&E.... approved for concrete placement.

Footing Inspection Not Ready 6/11/2024 (12:30 - 2:30) 6/11/2024 (PM) 06/11/2024
Corrections:


Miscellaneous/Other
Comment Only
06/11/2024
Not ready for inspection

Footing Inspection Passed 6/12/2024 (12:30 - 2:30) 6/12/2024 (PM) 06/12/2024
Corrections:


Miscellaneous/Other
Comment Only
06/12/2024
Due to weather, not ready for inspection.... inspection canceled by contractor.

Footing Inspection Passed 6/13/2024 (12:30 - 2:30) 6/13/2024 (PM) 06/13/2024
Corrections:


Miscellaneous/Other
Outstanding
06/13/2024
Foundation wall at grid A, lines 7-9 Foundation wall at line 9, grid A-B

Footing Inspection Passed 6/20/2024 (12:30 - 2:30) 6/20/2024 (PM) 06/20/2024
Corrections:


Miscellaneous/Other
Comment Only
06/20/2024
Foundation wall at line 9, grids B-D Elevator shear walls between lines 6&7, grids D to E.

Footing Inspection Not Ready 6/21/2024 (12:30 - 2:30) 6/21/2024 (PM) 06/21/2024
Corrections:


Miscellaneous/Other
Comment Only
06/21/2024
Canceled inspection due to rain delay.

Footing Inspection Passed 6/24/2024 (12:30 - 2:30) 6/24/2024 (PM) 06/24/2024
Corrections:


Miscellaneous/Other
Comment Only
06/24/2024
Wall on line 9, from grids A to D. Wall is ready for concrete placement.

Footing Inspection Passed 6/25/2024 (12:30 - 2:30) 6/25/2024 (PM) 06/25/2024
Corrections:


Miscellaneous/Other
Comment Only
06/25/2024
Columns ready for forms and concrete.... Grid A, lines 7,8,&9 Grid B, lines 6&7 Grid C, lines 3,4,&5 Grid D, lines 2&3 Grid E, line 2 Shear walls between lines 6&7, and between grids D&E

Footing Inspection Passed 6/26/2024 (12:30 - 2:30) 6/26/2024 (PM) 06/26/2024
Corrections:


Miscellaneous/Other
Comment Only
06/26/2024
Footings and pads on grid J, lines 2-6.

Footing Inspection Passed 6/27/2024 (12:30 - 2:30) 6/27/2024 (PM) 06/27/2024
Corrections:


Miscellaneous/Other
Comment Only
06/27/2024
Pad footings ... Grid B, line 8 Grid C, lines 6&7 Grid D lines 4&5 Grid E, line 5

Footing Inspection Not Ready 6/28/2024 (12:30 - 2:30) 6/28/2024 (PM) 06/28/2024
Corrections:


Miscellaneous/Other
Comment Only
06/28/2024
Inspection canceled by contractor due to weather and not being ready.

Footing Inspection Passed 7/1/2024 (12:30 - 2:30) 7/1/2024 (PM) 07/01/2024
Corrections:


Miscellaneous/Other
Comment Only
07/01/2024
Footing at grids H to H', from lines 6.5 to 8.

Footing Inspection Passed 7/2/2024 (12:30 - 2:30) 7/2/2024 (PM) 07/02/2024
Corrections:


Miscellaneous/Other
Comment Only
07/02/2024
Columns set and ready for concrete placement. Grid , lines 4,5,&9 Grid E, lines 4&5 Grid C, lines 6,7,& 9 Grid A, lines 7,8,&9 Grid B, lines 8&9

Footing Inspection Passed 7/3/2024 (12:30 - 2:30) 7/3/2024 (PM) 07/03/2024
Corrections:


Miscellaneous/Other
Comment Only
07/03/2024
Rebar for footings, pads, piers and wall dowels... Line 8, grids H to E Grid E, lines 8-9 and grid F, lines 8-9 Line 9 grids E to D

Footing Inspection Not Ready 7/5/2024 (12:30 - 2:30) 7/5/2024 (PM) 07/08/2024
Corrections:


Miscellaneous/Other
Comment Only
07/08/2024
Jobsite closed down, no inspection today

Footing Inspection Not Ready 7/8/2024 (12:30 - 2:30) 7/8/2024 (PM) 07/08/2024
Corrections:


Miscellaneous/Other
Comment Only
07/08/2024
Columns being poured today were already inspected on an earlier date.

Footing Inspection Passed 7/9/2024 (12:30 - 2:30) 7/9/2024 (PM) 07/09/2024
Corrections:


Miscellaneous/Other
Comment Only
07/09/2024
Rebar for pads with column bars and wall bars in one pad... Line 8, grids C and D Line 7, grids F and G Line 6, grids F,G, and H Wall sections on line 8, grids E to G.7 Grid E, line 8 to 9 Line 9, grids D to E

Footing Inspection Passed 7/10/2024 (12:30 - 2:30) 7/10/2024 (PM) 07/10/2024
Corrections:


Miscellaneous/Other
Comment Only
07/10/2024
Rebar Columns ... Line 9 grid A Grid B, lines 8 & 9 Lines 4&5, grids E & D Grid C, lines 6,7,8,& 9 Lines 9 & 8, grid D Line 7 & 8, grid F Lines 6 & 7, grid G Line 6, grids H & J Line 5 & 4, grid J

Footing Inspection Passed 7/11/2024 (12:30 - 2:30) 7/11/2024 (PM) 07/11/2024
Corrections:


Miscellaneous/Other
Comment Only
07/11/2024
Strip footing and pad from grids G to D on line 1 Pad footing at grid F, line 2 Pad footings on grid G, lines 2,3,4,&5 Pad footings on grid H, lines 3,4&5

Footing Inspection Partial Pass 7/12/2024 (12:30 - 2:30) 7/12/2024 (PM) 07/15/2024
Corrections:


Miscellaneous/Other
Comment Only
07/15/2024
See special inspection documents.

Footing Inspection Passed 7/15/2024 (12:30 - 2:30) 7/15/2024 (PM) 07/15/2024
Corrections:


Miscellaneous/Other
Comment Only
07/15/2024
Elevator shear walls between grids D and E, lines 2.6 to 3...approved

Footing Inspection Passed 7/16/2024 (12:30 - 2:30) 7/16/2024 (PM) 07/16/2024
Corrections:


Miscellaneous/Other
Comment Only
07/16/2024
8 columns being poured today, the columns listed are approved for concrete placement. Grid F, lines 1&2 Grid G, lines 1,2,&3 Grid H, lines 3,,4,&5 Grid J, lines 1.7, 3,4,&6 Wall section on grid H, lines 6.7 to line 8

Footing Inspection Passed 7/17/2024 (12:30 - 2:30) 7/17/2024 (PM) 07/17/2024
Corrections:


Miscellaneous/Other
Comment Only
07/17/2024
Columns on line 9, E to F. Columns on grid F, lines 8-9 Wall infill on line 8, from grids G.7 to H.5

Footing Inspection Passed 7/18/2024 (12:30 - 2:30) 7/18/2024 (PM) 07/18/2024
Corrections:


Miscellaneous/Other
Comment Only
07/18/2024
Footing on line 5, grids G to E Grid F, lines 5 to.6 Grid F.5, lines 4.5 to 5

Footing Inspection Passed 7/19/2024 (12:30 - 2:30) 7/19/2024 (PM) 07/19/2024
Corrections:


Miscellaneous/Other
Comment Only
07/19/2024
Wall footing at grid B.5, lines 7.8 to 8 Wall footing at line 7.8, between grids B and C

Footing Inspection Passed 7/22/2024 (12:30 - 2:30) 7/22/2024 (PM) 07/22/2024
Corrections:


Miscellaneous/Other
Comment Only
07/22/2024
Rebar for wall on grid H, lines 6.7 to 8

Footing Inspection Passed 7/23/2024 (12:30 - 2:30) 7/23/2024 (PM) 07/23/2024
Corrections:


Miscellaneous/Other
Comment Only
07/23/2024
Approved to pour wall on grid H, lines 6.7 to 8

Footing Inspection Passed 7/24/2024 (12:30 - 2:30) 7/24/2024 (PM) 07/24/2024
Corrections:


Miscellaneous/Other
Comment Only
07/24/2024
Columns on grid C, lines 2 & 2.3, imbeds are in and ok to pour concrete to columns

Footing Inspection Passed 7/25/2024 (12:30 - 2:30) 7/25/2024 (PM) 07/25/2024
Corrections:


Miscellaneous/Other
Comment Only
07/25/2024
Wall sections.... Grid F, lines 5-6 Grid F to F.8, line 5

Footing Inspection Passed 7/26/2024 (12:30 - 2:30) 7/26/2024 (PM) 07/26/2024
Corrections:


Miscellaneous/Other
Comment Only
07/26/2024
Wall at line 5-6 , grid F Wall at grid F-F.8; line 5 Approved to place concrete.

Footing Inspection Not Ready 7/29/2024 (12:30 - 2:30) 7/29/2024 (PM) 07/29/2024
Corrections:


Miscellaneous/Other
Comment Only
07/29/2024
Work is ongoing with the 1st pt pour, setup is in process... not ready for inspection.

Footing Inspection Passed 7/30/2024 (12:30 - 2:30) 7/30/2024 (PM) 07/30/2024
Corrections:


Miscellaneous/Other
Comment Only
07/30/2024
Wall at line 4.5 to 5, grid F.4 Wall between grids E-F, line 5

Footing Inspection Not Ready 7/31/2024 (12:30 - 2:30) 7/31/2024 (PM) 07/31/2024
Corrections:


Miscellaneous/Other
Comment Only
07/31/2024
No inspection to this site today, still setting everything for the PT slab first pour

Footing Inspection Not Ready 8/1/2024 (12:30 - 2:30) 8/1/2024 (PM) 08/01/2024
Corrections:


Miscellaneous/Other
Comment Only
08/01/2024
Inspection canceled due to weather

Footing Inspection Not Ready 8/2/2024 (12:30 - 2:30) 8/2/2024 (PM) 08/06/2024
Corrections:


Miscellaneous/Other
Comment Only
08/06/2024
Working on PT deck first pour,not ready for inspection

Footing Inspection Not Ready 8/6/2024 (2:30 - 3:30) 8/6/2024 (PM) 08/06/2024
Corrections:


Miscellaneous/Other
Comment Only
08/06/2024
PT deck pour number 1... Grids A-E, lines 1-5.7 approximately Grid E-J, lines 1.3.8 approximately Some small corrections with cables to be completed prior to concrete placement. Rebar is mostly done, some rebar still needed to be completed.

Footing Inspection Passed 8/7/2024 (12:30 - 2:30) 08/07/2024
Corrections:


Miscellaneous/Other
Comment Only
08/07/2024
Post tension deck at grids A -E, lines 1-5.6 and grids E-J, lines 1- about 3.8 approved.... pending special inspection to verify deck and any last minute details to be done prior to concrete placement.

Footing Inspection Passed 8/9/2024 (12:30 - 2:30) 8/9/2024 (PM) 08/09/2024
Corrections:


Miscellaneous/Other
Comment Only
08/09/2024
Columns on level 2.... grid C, lines 2,3,4 & 5 Grid D, lines 1, 1.7, 3,4,&5 Grid E, lines 1,1.7,4 &5

Footing Inspection Passed 8/12/2024 (12:30 - 2:30) 8/12/2024 (PM) 08/12/2024
Corrections:


Miscellaneous/Other
Comment Only
08/12/2024
Level 2 columns... Grid C, line 3 Grid F, lines 1&2 Grid G, lines 1,2,&3 Grid H, lines 1,2,&3 Grid J, lines 1.7,2.3, 3

Footing Inspection Passed 8/13/2024 (12:30 - 2:30) 8/13/2024 (PM) 08/13/2024
Corrections:


Miscellaneous/Other
Comment Only
08/13/2024
Columns on 2nd level grid C, lines 1 & 1.7 Elevator walls on 2nd level, grids E to F, lines 2.6 to 3

Footing Inspection Not Ready 8/14/2024 (12:30 - 2:30) 8/14/2024 (PM) 08/14/2024
Corrections:


Miscellaneous/Other
Comment Only
08/14/2024
Columns for concrete placement were already inspected on 8/13 and approved

Footing Inspection Passed 8/15/2024 (12:30 - 2:30) 8/15/2024 (PM) 08/15/2024
Corrections:


Miscellaneous/Other
Comment Only
08/15/2024
No inspection today. Meeting with fire inspector and design team/ contractor about the future shutdown of main entrance for link to building work. Exiting within building has been addressed and entry will get temp reloction to employee entrance with know box relocate in that area.

Footing Inspection Not Ready 8/16/2024 (12:30 - 2:30) 8/16/2024 (PM) 08/16/2024
Corrections:


Miscellaneous/Other
Comment Only
08/16/2024
Level 2 second PT pour... work for rebar placement and cables is still ongoing. To be fully inspected on monday 8/19

Footing Inspection Passed 8/19/2024 (12:30 - 2:30) 8/19/2024 (PM) 08/19/2024
Corrections:


Miscellaneous/Other
Comment Only
08/19/2024
Level 2, remainder of PT deck pour is almost completed and ready for concrete placement. Special inspection to complete inspection detailing prior to pour.

Footing Inspection Not Ready 8/20/2024 (12:30 - 2:30) 8/20/2024 (PM) 08/20/2024
Corrections:


Miscellaneous/Other
Comment Only
08/20/2024
Concrete placement at 2nd level PT deck today, not ready for other inspections.

Footing Inspection Passed 8/27/2024 (12:30 - 2:30) 8/27/2024 (PM) 08/27/2024
Corrections:


Miscellaneous/Other
Comment Only
08/27/2024
All columns on level 2 of the second PT section concrete pour section were viewed and approved on 8/21/24. Column on line 5, grid E has 5 bolts to be set, torked and broken off in the metal sleeve used for lap splice... upon completion of this detail, column can be formed and poured. Elevator shear wallson level 2, between lines 6&7, and between grids D & E... approved

Footing Inspection Not Ready 8/28/2024 (12:30 - 2:30) 8/28/2024 (PM) 08/28/2024
Corrections:


Miscellaneous/Other
Comment Only
08/28/2024
Still in process of getting deck ready for the next concrete pour.

Footing Inspection Not Ready 8/29/2024 (12:30 - 2:30) 8/29/2024 (PM) 08/29/2024
Corrections:


Miscellaneous/Other
Comment Only
08/29/2024
Progress still ongoing, not ready for inspection.

Footing Inspection Not Ready 8/30/2024 (12:30 - 2:30) 8/30/2024 (PM) 08/30/2024
Corrections:


Miscellaneous/Other
Comment Only
08/30/2024
Work is onging for the next PT pour, most the rbar is in place as per design, cables are also in place per design. Still have some rebar to install and electrical to put in place as well.

Footing Inspection Passed 9/3/2024 (12:30 - 2:30) 9/3/2024 (PM) 09/03/2024
Corrections:


Miscellaneous/Other
Comment Only
09/03/2024
Level 3 first PT deck pour approved per the design on plans. Detail work to be done and inspected by the special inspector prior to concrete placement.

Footing Inspection Not Ready 9/4/2024 (12:30 - 2:30) 9/4/2024 (PM) 09/04/2024
Corrections:


Miscellaneous/Other
Comment Only
09/04/2024
No inspection needed today, the PT deck first pour of 3rd floor has already been done and now they are getting the 2nd PT deck pour ready along with standing columns at first deck pour of 3rd level.

Footing Inspection Passed 9/5/2024 (12:30 - 2:30) 9/5/2024 (PM) 09/05/2024
Corrections:


Miscellaneous/Other
Comment Only
09/05/2024
Columns at level 3... Grid C, lines 1,2,3,4 Grid D, lines 1,2,3,4,5 Grid E, lines 1,2,4,5 Grid F, lines 1,2 Grid G, lines 1,2,3 Grid H, lines 1,2,3 Grid J, lines 1,2,3 Rebar columns are per plan.

Footing Inspection Passed 9/6/2024 (12:30 - 2:30) 9/6/2024 (PM) 09/06/2024
Corrections:


Miscellaneous/Other
Comment Only
09/06/2024
Columns for which are being poured today were inspected on 9/5/24 and have been inspected and approved.

Footing Inspection Passed 9/9/2024 (12:30 - 2:30) 9/9/2024 (PM) 09/09/2024
Corrections:


Miscellaneous/Other
Comment Only
09/09/2024
Rebar installation for the 2nd PT deck pour of third level is still ongoing.

Footing Inspection Passed 9/10/2024 (12:30 - 2:30) 9/10/2024 (PM) 09/10/2024
Corrections:


Miscellaneous/Other
Comment Only
09/10/2024
Elevator walls at 3rd level, between lines 2.3 to 3 and grids E to F.

Footing Inspection Passed w/ Conditions 9/11/2024 (12:30 - 2:30) 9/11/2024 (PM) 09/11/2024
Corrections:


Miscellaneous/Other
Comment Only
09/11/2024
Level 3, second PT slab pour approved pending special inspection approval for any trim work and extra rebar needed to still be placed prior to concrete placement.

Footing Inspection Not Ready 9/12/2024 (12:30 - 2:30) 9/12/2024 (PM) 09/12/2024
Corrections:


Miscellaneous/Other
Comment Only
09/12/2024
PT deck pour today, no other rebar is set for inspection at this time.

Footing Inspection Passed 9/13/2024 (12:30 - 2:30) 9/13/2024 (PM) 09/13/2024
Corrections:


Miscellaneous/Other
Comment Only
09/13/2024
Columns at 3rd floor deck... Grid H, lines 4-6 & 8 Grid J, lins 4-7 Grid G, lines 4-8 Grif F, lines 6-8 Grid E, lines 6-8 Grid D, lines 6-8 Grid C lines 6-8 Shear wall at grid H, lines 7-8

Footing Inspection Not Ready 9/16/2024 (12:30 - 2:30) 9/16/2024 (PM) 09/16/2024
Corrections:


Miscellaneous/Other
Comment Only
09/16/2024
Work is still ongoing, no inspection needed for today.

Footing Inspection Not Ready 9/17/2024 (12:30 - 2:30) 9/17/2024 (PM) 09/17/2024
Corrections:


Miscellaneous/Other
Comment Only
09/17/2024
Not ready for inspection today, still setting up for the next PT pour and the east elevator shear walls of level 3 are not in place.

Footing Inspection Not Ready 9/18/2024 (12:30 - 2:30) 9/18/2024 (PM) 09/18/2024
Corrections:


Miscellaneous/Other
Comment Only
09/18/2024
Not ready for inspection

Footing Inspection Passed 9/19/2024 (12:30 - 2:30) 9/19/2024 (PM) 09/19/2024
Corrections:


Miscellaneous/Other
Comment Only
09/19/2024
Elevator shear walls (5,6,7,&8) on level 3 between grids D and E, and between lines 6&7.

Footing Inspection Passed 9/20/2024 (12:30 - 2:30) 9/20/2024 (PM) 09/20/2024
Corrections:


Miscellaneous/Other
Comment Only
09/20/2024
4th floor first PT deck pour, rebar and cables installed as per plans and design. Special inspection will be onsite to verify the detailing needed prior to slab pour.

Footing Inspection Passed 9/23/2024 (12:30 - 2:30) 9/23/2024 (PM) 09/23/2024
Corrections:


Miscellaneous/Other
Comment Only
09/23/2024
Level 3 columns at the first PT pour of this level.... Grid C, lines 2,3,&5 Grid D, lines 1,2,3,4,&5 Grid E, lines 1,2,4,&5 Grid J, lines 1,2,&3

Footing Inspection Passed 9/24/2024 (12:30 - 2:30) 9/24/2024 (PM) 09/24/2024
Corrections:


Miscellaneous/Other
Comment Only
09/24/2024
Fourth level columns at the first PT por of this level... Grid C, line 4 Grid F, line 1&2 Grid G, lines 1,2,&3 Grid H, lines 1,2,&3

Footing Inspection Not Ready 9/25/2024 (12:30 - 2:30) 9/25/2024 (PM) 09/25/2024
Corrections:


Miscellaneous/Other
Comment Only
09/25/2024
Rebar for elevator shear walls on level four are in process of being built along with all rebar and cables for the next deck pour at level 4.

Footing Inspection Passed 9/27/2024 (12:30 - 2:30) 9/27/2024 (PM) 09/27/2024
Corrections:


Miscellaneous/Other
Comment Only
09/27/2024
Second PT deck pour of fourth level is pending approval from 3rd party inspector to place concrete on 9/30 early A. M. The rebar is incomplete at this inspection and workers will be coming in on 9/28 to finish up the rebar placement. 3rd party inspection to verify and give approval.

Footing Inspection Passed 9/30/2024 (12:30 - 2:30) 9/30/2024 (PM) 09/30/2024
Corrections:


Miscellaneous/Other
Comment Only
09/30/2024
Columnson 4th floor... Grid J, lines 4,5,6,&7 Grid H, lines 4,5,&6 Grid C, lines 6&7

Footing Inspection Passed 10/1/2024 (12:30 - 2:30) 10/1/2024 (PM) 10/01/2024
Corrections:


Miscellaneous/Other
Comment Only
10/01/2024
All remaining columns for the fourth floor are in place and approved.

Footing Inspection Passed 10/2/2024 (12:30 - 2:30) 10/2/2024 (PM) 10/02/2024
Corrections:


Miscellaneous/Other
Comment Only
10/02/2024
Wall section with column on level 4 , grid H , lines 7-8.

Footing Inspection Passed 10/3/2024 (12:30 - 2:30) 10/3/2024 (PM) 10/03/2024
Corrections:


Miscellaneous/Other
Comment Only
10/03/2024
Wall and column being poured has already been inspected and approved

Footing Inspection Not Ready 10/4/2024 (12:30 - 2:30) 10/4/2024 (PM) 10/04/2024
Corrections:


Miscellaneous/Other
Comment Only
10/04/2024
Still installing rebar and remaing forms for roof pour.

Footing Inspection Not Ready 10/7/2024 (12:30 - 2:30) 10/7/2024 (PM) 10/07/2024
Corrections:


Miscellaneous/Other
Comment Only
10/07/2024
Rebar and cables for Roof PT pour is still in process of being set up, no inspection needed by contractor yet .

Footing Inspection Not Ready 10/8/2024 (12:30 - 2:30) 10/8/2024 (PM) 10/08/2024
Corrections:


Miscellaneous/Other
Comment Only
10/08/2024
Not ready for inspection

Footing Inspection Not Ready 10/9/2024 (12:30 - 2:30) 10/9/2024 (PM) 10/09/2024
Corrections:


Miscellaneous/Other
Comment Only
10/09/2024
Not ready for inspection

Footing Inspection Not Ready 10/10/2024 (12:30 - 2:30) 10/10/2024 (PM) 10/10/2024
Corrections:


Miscellaneous/Other
Comment Only
10/10/2024
Nothing ready to inspect at this time

Footing Inspection Not Ready 10/11/2024 (12:30 - 2:30) 10/11/2024 (PM) 10/11/2024
Corrections:


Miscellaneous/Other
Comment Only
10/11/2024
Still in process of roof layout for rebar and cables, and roof daddits... not ready for any inspection.

Footing Inspection Not Ready 10/14/2024 (12:30 - 2:30) 10/14/2024 (PM) 10/14/2024
Corrections:


Miscellaneous/Other
Comment Only
10/14/2024
PT at roof.... most all rebar and cables are in place, installers are still working on putting in trim bars and some top steel.

Footing Inspection Not Ready 10/15/2024 (12:30 - 2:30) 10/15/2024 (PM) 10/15/2024
Corrections:


Miscellaneous/Other
Comment Only
10/15/2024
Still working on deck to get ready for PT pour, not ready for inspection

Footing Inspection Passed 10/16/2024 (12:30 - 2:30) 10/16/2024 (PM) 10/16/2024
Corrections:


Miscellaneous/Other
Comment Only
10/16/2024
Roof has been inspected by 3rd party, the engineer, and the city inspector and is ready for concrete placement.

Footing Inspection Not Ready 10/17/2024 (12:30 - 2:30) 10/17/2024 (PM) 10/17/2024
Corrections:


Miscellaneous/Other
Comment Only
10/17/2024
Roof PT deck was poured this morning, no inspection needed today.

Footing Inspection Not Ready 10/18/2024 (12:30 - 2:30) 10/18/2024 (PM) 10/18/2024
Corrections:


Miscellaneous/Other
Comment Only
10/18/2024
Not ready for any inspections today

Footing Inspection Passed 10/21/2024 (12:30 - 2:30) 10/21/2024 (PM) 10/21/2024
Corrections:


Miscellaneous/Other
Comment Only
10/21/2024
Wall sections on east and south sides of atrium at roof.

Footing Inspection Not Ready 10/22/2024 (12:30 - 2:30) 10/22/2024 (PM) 10/22/2024
Corrections:


Miscellaneous/Other
Comment Only
10/22/2024
No inspection for this building today.

Footing Inspection Passed 9/26/2024 (12:30 - 2:30) 10/23/2024
Corrections:


Miscellaneous/Other
Comment Only
10/23/2024
Stub wall sections at roof around atrium perimeter, rebar viewed and approved

Footing Inspection Passed 10/30/2024
Corrections:


Miscellaneous/Other
Comment Only
10/30/2024
Pad footing and columns for skyway bridge at grid A, lines 1.7 to 2.5

Footing Inspection Not Ready 2/3/2025 (10:00 - 12:00) 2/3/2025 (AM) 02/03/2025
Corrections:


Miscellaneous/Other
Comment Only
02/03/2025
Bottom mat Rebar for gathering stair seating area is in place , progress is ongoing. Last section of slab on grade has been pushed back a day.... need to reinspect when ready.