Permit Application Status

PRFD202405011


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFD202405011
Foundation
Permit(s) Issued
PORT AUTHORITY OF THE CITY OF BLOOMINGTON
Other
Not Required
Bloomington Parking Structure is new construction of a 185,000 sq.ft., 6-story parking structure, with capacity for 555 parking spaces for employees and visitors in support of SICK Inc’s continued development at their new Bloomington Campus, located on the north-west corner of the intersection of Lindau Lane and 28th Street. Full permit is under PRBD202402359
04/22/2024
04/29/2024
07/07/2025

Locations

Permits

Permit Number: PRFD202405011

Foundation
Issued
04/29/2024
07/07/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Building Final Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Progress Inspection Pending
Footing Inspection Passed 6/11/2024 (10:00 - 12:00) 6/11/2024 (AM) 06/11/2024
Corrections:


Miscellaneous/Other
Comment Only
06/11/2024
Perimeter strip footings and pads on grid A, from line to about line 10.5. 2- F15 pads on grid B 10 & 11.

Progress Inspection Passed 06/26/2024
Corrections:


Miscellaneous/Other
Comment Only
06/26/2024
Grid C, lines 2 through 12... footings, pads. Wall rebar imbed, and column rebar imbed. Wall footing on line 11. Wall footings just off line 7, between grids B and C.

Progress Inspection Passed 06/27/2024
Corrections:


Miscellaneous/Other
Comment Only
06/27/2024
Rebar for Columns on line C, grids 8-12 are in place and approved

Progress Inspection Passed 07/02/2024
Walls on grid A, lines 7-9 & 9-10 Wall on line 12, gridsc to about B.7, and wall on grid C, lines 11-12 Columns set and ready for forms and concrete placement pendingthe install of imbed plates . Grid B, lines 3-7 & 10 Grid Clines 1.5&2, 3,4,5,&7-9
Corrections:


Miscellaneous/Other
Comment Only
07/02/2024
Walls on grid A, lines 7-9 & 9-10 Wall on line 12, grids C to about B.7, and grid C, lines 11-12 Columns set and ready for forms and imbed plates to still be installed. Grid B, lines 3-7, & 10 Grid C, at line 1 location, 1.5, 2, 3,4,5,&7-9

Progress Inspection Passed 07/03/2024
Corrections:


Miscellaneous/Other
Comment Only
07/03/2024
Rebar for poired walls... Grid A, lines 9-11 Line 12, A.5-B

Progress Inspection Passed 07/08/2024
Corrections:


Miscellaneous/Other
Comment Only
07/08/2024
Rebar at poured walls on line 12, grids B to B.5 Grid C, lines 11-12 Rebar for column on grid B, line 1

Progress Inspection Passed 07/09/2024
Corrections:


Miscellaneous/Other
Comment Only
07/09/2024
Rebar for Walls formed and ready for concrete ... Line 12, grids B to B.5 Grid C, lines 10 to 11 Column rebar for formed columns ready for concrete... Grid C, lines 8&9 Grid B, lines 3&7 Grid A, lines 1&3

Progress Inspection Passed 07/10/2024
Corrections:


Miscellaneous/Other
Comment Only
07/10/2024
Concrete being placed in columns... Line 1, grids A, B, and C Line 6, grid A Rebar has been inspected on these columns.

Progress Inspection Passed 07/11/2024
Corrections:


Miscellaneous/Other
Comment Only
07/11/2024
Footing between line 1&2, at approximately grid B.7 Wall sections on grid A, lines 1-2, 4-5, & 5-6

Progress Inspection Passed 07/16/2024
Corrections:


Miscellaneous/Other
Comment Only
07/16/2024
Wall section at line 1 to 1.7, at approximately grid B.8 Wall section on line 1, grid A to A.3 Grid A.3, lines 1 to 2 Line 2, grids A to A.3

Progress Inspection Passed 07/22/2024
Corrections:


Miscellaneous/Other
Comment Only
07/22/2024
Small section of wall infill at line 1, just befor grid C. Wall section on grid C, lines 8 to 9

Progress Inspection Passed 07/23/2024
Corrections:


Miscellaneous/Other
Comment Only
07/23/2024
Wall sections at... Grid C, lines 6 to 7 Line 6.7, grids B to C Approved for concrete placement

Progress Inspection Passed 07/24/2024
Corrections:


Miscellaneous/Other
Comment Only
07/24/2024
Wall sections on grid B, lines 3-4 & 4-5

Progress Inspection Passed 07/25/2024
Corrections:


Miscellaneous/Other
Comment Only
07/25/2024
Wall sections.... Grid C, line 7 to almost line 8 Line 7.6, grid C to about B.6

Progress Inspection Passed 07/26/2024
Corrections:


Miscellaneous/Other
Comment Only
07/26/2024
Remaining wall section on grid C, between lines 7-8 Wall section on grid C, lines 4-5.

Progress Inspection Passed 07/29/2024
Corrections:


Miscellaneous/Other
Comment Only
07/29/2024
Wall sections on grid C, lines 2-3, & 3-4. Wall section with rebar standing and to be formed and poured at later date. Line 11, grids A to A.3. Stairwell walls are mostly done with rebar placement, top bars to be installed yet... location between lines 11&12, grids A.3-A.5,( to be rechecked by 3rd party inspectionand /or city inspector.

Progress Inspection Passed 07/30/2024
Corrections:


Miscellaneous/Other
Comment Only
07/30/2024
Wall on line 11, grid A to A.3

Progress Inspection Passed 07/31/2024
Corrections:


Miscellaneous/Other
Comment Only
07/31/2024
Wall section on line 11, grids A.3 to B

Progress Inspection Passed 08/07/2024
Corrections:


Miscellaneous/Other
Comment Only
08/07/2024
Elevator walls/ rebar at lines 11.5 to 12, grids A to A.5.

Progress Inspection Passed 08/13/2024
Corrections:


Miscellaneous/Other
Comment Only
08/13/2024
Shear wall on line 1, grids B.8 to C

Progress Inspection Passed 08/16/2024
Corrections:


Miscellaneous/Other
Comment Only
08/16/2024
Stair walls at lines 1.7 and 2, grids B.7 to C Grid B.7, line 1.7 to 2 Walls are being formed for concrete pour scheduled for 8/19

Progress Inspection Passed 08/28/2024
Corrections:


Miscellaneous/Other
Comment Only
08/28/2024
Rebar for the slab on grade 2nd pour as per plan detail and was viewed on 8/27/24.

Progress Inspection Partial Pass 09/12/2024
Corrections:


Miscellaneous/Other
Comment Only
09/12/2024
1st PT deck pour of the 2nd level at ramp... rebar that is in place and cables is as per design. There is still more rebar to be put in place and some detail work to be done which can be viewed at tomorrow's inspection (9/13).

Progress Inspection Partial Pass 09/13/2024
Corrections:


Miscellaneous/Other
Comment Only
09/13/2024
2nd level first PT pour scheduled for 9/16 a.m is mostly completed per the design. Special inspection to verify bars that still need to go in along with trim bars and cables that have been loosened at heads along ramp .

Progress Inspection Passed 09/17/2024
Corrections:


Miscellaneous/Other
Comment Only
09/17/2024
Columns at second level of first PT deck pour... Grid A.5, line 12 Grid A, line 6 to line 11 Grid B, line 6 to line 12 Grid C, line 7 to line 12

Progress Inspection Passed 09/23/2024
Corrections:


Miscellaneous/Other
Comment Only
09/23/2024
Level 2, second PT deck pour... rebar and cables as per plans and design, 4 cables missing and the rebar that is not yet inplace, along with detail work... will be viewed by the special inspection before deck pour.

Progress Inspection Passed 09/25/2024
Corrections:


Miscellaneous/Other
Comment Only
09/25/2024
Columns for level 2... Grid A, lines 1-5 Grid B, lines 1-6 Grid C, lines 2&3 Line 1, grid B.7

Progress Inspection Passed 09/27/2024
Corrections:


Miscellaneous/Other
Comment Only
09/27/2024
Level 2 shear wall at grids A to A.5, at line 11.

Progress Inspection Passed 10/01/2024
Corrections:


Miscellaneous/Other
Comment Only
10/01/2024
Walls at lines 1 to 2, at grids A and approximately A.3 Walls on grids A and A.3, lines 1 to 2 Wall on line 1.3, from grid B.7 to grid C. Elevator shear walls, located between grids A.2 to A.5 and lines 11-12.

Progress Inspection Passed 10/03/2024
Corrections:


Miscellaneous/Other
Comment Only
10/03/2024
Shear wall on line 1, from grids B.8 to C

Progress Inspection Passed 10/04/2024
Corrections:


Miscellaneous/Other
Comment Only
10/04/2024
First pour section of 3rd level ramp pour approved, third party inspection will be viewing the misc items left prior to concrete placement.

Progress Inspection Passed 10/09/2024
Corrections:


Miscellaneous/Other
Comment Only
10/09/2024
3rd level, 6 columns on grid A, lines 6-12 Grid B, line 6 column

Progress Inspection Passed 10/14/2024
Corrections:


Miscellaneous/Other
Comment Only
10/14/2024
PT pour section of third floor ramp is approved pending third party inspection for misc trim rebar that is being set. This concrete pour is scheduled for 10/15 a.m.

Progress Inspection Passed 10/15/2024
Corrections:


Miscellaneous/Other
Comment Only
10/15/2024
Shearwall on line 11, grid A to A.3 Column on line 11, grid A.5 Columns on grid A, lines 3&4

Progress Inspection Passed 10/16/2024
Corrections:


Miscellaneous/Other
Comment Only
10/16/2024
Columns on 3rd level.... Grid A, lines 1,2,&3 Grid B, lines 1,2,3,&4 Grid B.7, line 1 Grid C, lines 1.7, 2,3,&4

Progress Inspection Passed 10/22/2024
Corrections:


Miscellaneous/Other
Comment Only
10/22/2024
First PT pour of ramp for level 4 ... All cables and rebar installed, some trim bar and stirrups to be installed and final approval by third party inspection prior to concrete placement.

Progress Inspection Passed 10/23/2024 (12:30 - 2:30) 10/23/2024 (PM) 10/23/2024
Corrections:


Miscellaneous/Other
Comment Only
10/23/2024
West stair landings are being built and still in progress. Two columns on 4thlevel to be poured today, grid C, lines 6&7

Progress Inspection Passed 10/24/2024 (12:30 - 2:30) 10/24/2024 (PM) 10/24/2024
Corrections:


Miscellaneous/Other
Comment Only
10/24/2024
4th level... columns at grid A, lines 9,10,& 11 and grid A.5, line 12 Grid B, lines 6,7,8,9,10,11,&,12 Grid C, grid,8,9,10,11,&,12

Progress Inspection Passed 10/25/2024 (12:30 - 2:30) 10/25/2024 (PM) 10/25/2024
Corrections:


Miscellaneous/Other
Comment Only
10/25/2024
Fourth level columns from lines 6-12 on grid A. Stairwell wall on 4th level, line 1.5, grids B.6-C East stair first level landing.

Progress Inspection Not Ready 10/28/2024 (12:30 - 2:30) 10/28/2024 (PM) 10/28/2024
Corrections:


Miscellaneous/Other
Comment Only
10/28/2024
Install of cables and rebar for the next PT pour of fourth floor ramp section is still ongoing, not ready for inspection at this time.

Progress Inspection Passed 10/29/2024 (12:30 - 2:30) 10/29/2024 (PM) 10/29/2024
Corrections:


Miscellaneous/Other
Comment Only
10/29/2024
Elevator walls at level 3.... walls between lines 11.5 to 12, grids A.2 to A.5. Remainder of level 4 PT deck ... approved, pending any last minute corrections to be viewed by third party inspection prior to concrete pour.

Progress Inspection Not Ready 10/30/2024 (12:30 - 2:30) 10/30/2024 (PM) 10/30/2024
Corrections:


Miscellaneous/Other
Comment Only
10/30/2024
No inspection needed for today, the ramp pour was pushed off to 10/31 due to possible rain. This sectin of pour has been approved for concrete placement.

Progress Inspection Not Ready 10/31/2024 (12:30 - 2:30) 10/31/2024 (PM) 10/31/2024
Corrections:


Miscellaneous/Other
Comment Only
10/31/2024
No work ready for inspection due to weather.

Progress Inspection Passed 11/4/2024 (12:30 - 2:30) 11/4/2024 (PM) 11/04/2024
Corrections:


Miscellaneous/Other
Comment Only
11/04/2024
Columns on level 4... Line 1, grid B.7 Grid A, lines 1,2,3,&4 Gric B, lines 1,2,3,&4 Grid C, lines 1.6,2,3,&4

Progress Inspection Not Ready 11/5/2024 (12:30 - 2:30) 11/5/2024 (PM) 11/05/2024
Corrections:


Miscellaneous/Other
Comment Only
11/05/2024
Not ready for inspection.

Progress Inspection Passed 11/13/2024 (12:30 - 2:30) 11/13/2024 (PM) 11/13/2024
Corrections:


Miscellaneous/Other
Comment Only
11/13/2024
PT deck to level 5 approved for concrete placement.

Progress Inspection Passed 11/14/2024 (12:30 - 2:30) 11/14/2024 (PM) 11/14/2024
Corrections:


Miscellaneous/Other
Comment Only
11/14/2024
Wall at 4th level of stairway off line 1, approximate grid B.8 to C. Columns for east section of poured PT level 5 are together and on ground to be craned up and set in place, third party inspector to verify column placement.

Progress Inspection Passed 11/18/2024 (12:30 - 2:30) 11/18/2024 (PM) 11/18/2024
Corrections:


Miscellaneous/Other
Comment Only
11/18/2024
Level 5. Columns on grid A, lines 6,7,8,9,10,& 11

Progress Inspection Passed 11/19/2024 (12:30 - 2:30) 11/19/2024 (PM) 11/19/2024
Corrections:


Miscellaneous/Other
Comment Only
11/19/2024
4th level. Wall section at line 1.3 at grid B.7 to C Elevator walls between lines 11 to 12, grids A to A.5

Progress Inspection Passed 11/20/2024 (12:30 - 2:30) 11/20/2024 (PM) 11/20/2024
Corrections:


Miscellaneous/Other
Comment Only
11/20/2024
5th level PT ramp approved for concrete placement.

Progress Inspection Not Ready 11/21/2024 (12:30 - 2:30) 11/21/2024 (PM) 11/21/2024
Corrections:


Miscellaneous/Other
Comment Only
11/21/2024
Inspections are caught up, nothing is ready for inspection at this time..

Progress Inspection Passed 11/22/2024 (12:30 - 2:30) 11/22/2024 (PM) 11/22/2024
Corrections:


Miscellaneous/Other
Comment Only
11/22/2024
Wall section on 1st level ramp at grid B, lines 2-3.

Progress Inspection Not Ready 11/25/2024 (12:30 - 2:30) 11/25/2024 (PM) 11/25/2024
Corrections:


Miscellaneous/Other
Comment Only
11/25/2024
PT deck pour of the 5th level was supposed to be today barring any weather changes. The underside of this deck pour is temp heated for the pour.

Progress Inspection Passed 11/26/2024 (12:30 - 2:30) 11/26/2024 (PM) 11/26/2024
Corrections:


Miscellaneous/Other
Comment Only
11/26/2024
Columns at 5th level deck... Grid A, lines 1,2,3,4 Grid B, lines 1 through 10 Line 1, grid B.7 Grid C, lines 2&3

Progress Inspection Passed 11/27/2024 (12:30 - 2:30) 11/27/2024 (PM) 11/27/2024
Corrections:


Miscellaneous/Other
Comment Only
11/27/2024
Wall section starting on grid A, and line 11.

Progress Inspection Not Ready 12/2/2024 (12:30 - 2:30) 12/2/2024 (PM) 12/02/2024
Corrections:


Miscellaneous/Other
Comment Only
12/02/2024
Still working on the installation of rebar and cables for the 6th level PT slab.

Progress Inspection Passed 12/3/2024 (12:30 - 2:30) 12/3/2024 (PM) 12/03/2024
Corrections:


Miscellaneous/Other
Comment Only
12/03/2024
Level six elevator walls between lines 1&2, and grids A to A.3 Stiar wall at line 1.5, grids B.8 to C

Progress Inspection Not Ready 12/4/2024 (12:30 - 2:30) 12/4/2024 (PM) 12/04/2024
Corrections:


Miscellaneous/Other
Comment Only
12/04/2024
Not ready for inspection, work is still in process for the next PT deck pour.

Progress Inspection Partial Pass 12/5/2024 (12:30 - 2:30) 12/5/2024 (PM) 12/05/2024
Corrections:


Miscellaneous/Other
Comment Only
12/05/2024
Wok is still ongoing for the 6th level PT deck, cables are in place and as per design. Rebar is still being installed to complete the portion being poured on monday. Rebar for Wall section at stairway is being installed as well.

Progress Inspection Passed 12/6/2024 (12:30 - 2:30) 12/6/2024 (PM) 12/06/2024
Corrections:


Miscellaneous/Other
Comment Only
12/06/2024
PT deck for level 6 first pour approved for concrete, pending third party inspection for any unfinished misc tying of condiut, bars and chairs that need to be finished prior to concrete placement.

Progress Inspection Passed 12/11/2024
Corrections:


Miscellaneous/Other
Comment Only
12/11/2024
Columns on level 6, grid B, lines 5,6,7,8,9,&10... and columns laying on deck and marked for location.... approved

Progress Inspection Passed 01/08/2025
Corrections:


Miscellaneous/Other
Comment Only
01/08/2025
East stair and column between grids A to A.5 , lines 11 to 12 Columns on grid A, line 5, and grid C, line 6