PRFS201706490
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Failed | 11/9/2017 (10:00 - 12:00) | 11/9/2017 | 11/09/2017 |
Corrections:
Miscellaneous/Other
Outstanding
11/09/2017
Arrived on scene at requested time and fire alarm contractor was in the process of wiring fire alarm related components.
System passed the mechanical trip test, including pipe integrity test, however failed fire alarm portion of testing.
Also need to test pressure reducing valve by flowing water.
Advised general contractor of the job that it is his responsibility to coordinate pretesting with the subcontractors and call for a re-inspection. All other re-inspections will ensure an additional inspection fee.
|
||||
Fire Inspection Final | Passed | 11/13/2017 (12:30 - 2:30) | 11/13/2017 | 11/13/2017 |
Corrections:
Miscellaneous/Other
Comment Only
11/13/2017
Arrived on scene at requested time and fire alarm contractor was in the process of wiring fire alarm related components.
System passed the mechanical trip test, including pipe integrity test, however failed fire alarm portion of testing.
Also need to test pressure reducing valve by flowing water.
Advised general contractor of the job that it is his responsibility to coordinate pretesting with the subcontractors and call for a re-inspection. All other re-inspections will ensure an additional inspection fee.
|