PRFS201711515
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Rough-in Inspection | Failed | 12/7/2017 (8:00 - 10:00) | 12/7/2017 (AM) | 12/07/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/07/2017
Receptionist unable to reach anyone to escort me to through the building and during inspection.
Contractor needs to be on site for future inspections.
|
||||
Fire Rough-in Inspection | Partial Pass | 12/11/2017 (12:30 - 2:30) | 12/12/2017 (PM) | 12/11/2017 |
Rough In inspection completed on 12/11/2017 at 13:00. Inspected Phase I - 2 conference rooms, storage room, photo room, patio entrance, hallway outside storage room and west office area. Ok to cover all but the hallway and west office area. Need 1 head added in hallway by patio entrance. Found several missing and broken hangers and painted heads above the west office ceiling area. Egg crate ceiling being installed in hallway outside storage/photo room. Need to verify whether or not coverage is required below the egg crate ceiling - thincell 3/8" white 2' by 2' styrene tile TC-22/30C7A002 sold by SLP Lighting. Need to verify whether or not sprinkler protection is needed above the ceiling (plenum space). Sprinkler coverage is being provide below the grid ceiling. lmccarthy 12/11/2017 4:05 PM | ||||
Corrections:
Miscellaneous/Other
Outstanding
12/22/2017
Rough In inspection completed on 12/11/2017 at 13:00. Inspected Phase I - 2 conference rooms, storage room, photo room, patio entrance, hallway outside storage room and west office area. Ok to cover all but the hallway and west office area. Need 1 head added in hallway by patio entrance. Found several missing and broken hangers and painted heads above the west office ceiling area.
Egg crate ceiling being installed in hallway outside storage/photo room. Need to verify whether or not coverage is required below the egg crate ceiling - thincell 3/8" white 2' by 2' styrene tile TC-22/30C7A002 sold by SLP Lighting.
Need to verify whether or not sprinkler protection is needed above the ceiling (plenum space). Sprinkler coverage is being provide below the grid ceiling.
lmccarthy 12/11/2017 4:05 PM
|
||||
Fire Inspection Final | Partial Pass | 12/22/2017 (8:00 - 10:00) | 12/22/2017 | 12/22/2017 |
Corrections:
Miscellaneous/Other
Comment Only
12/22/2017
Partial final approved for ACT ceiling areas only.
|
||||
Fire Rough-in Inspection | VOID | 01/17/2018 | ||
Fire Inspection Final | Failed | 1/18/2018 (12:30 - 2:30) | 1/18/2018 (PM) | 01/18/2018 |
Corrections:
Miscellaneous/Other
Outstanding
01/18/2018
Contractor to provide information on open-grid ceiling prior to final.
|
||||
Fire Inspection Final | Passed | 1/24/2018 (10:00 - 12:00) | 1/24/2018 | 01/24/2018 |