Permit Application Status

PRFS201815250


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFS201815250
Fire Suppression System
Expired
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Provide new and modify existing fire sprinkler systems to accommodate the Mall of America Transit Station Renovation Project.
12/14/2018
03/20/2019
03/30/2020

Locations

Permits

Permit Number: PRFS201815250

Fire Suppression System
Expired
03/30/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Inspection Final Pending
Fire Rough-in Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
09/05/2019
Partial rough in approved for transit common area, except window wash portion. Need to add sprinkler protection along west class wall, both sides.

Fire Rough-in Inspection Partial Pass 6/4/2019 (10:00 - 12:00) 6/4/2019 (AM) 06/04/2019
Corrections:


Miscellaneous/Other
Comment Only
06/04/2019
Partial rough in approved for far and center bays of new dry system.

Fire Rough-in Inspection Partial Pass 7/19/2019 (7:00 - 8:00) 7/19/2019 (AM) 07/19/2019
Corrections:


Miscellaneous/Other
Comment Only
07/19/2019
Partial rough in approved for hard lids in cop shop. Also advised existing dry system north of new transit station needs to have heads relocated/added due to new building.

24-hr Air Test Start Not Ready 7/24/2019 (8:00 - 10:00) 7/24/2019 (AM) 07/24/2019
24-hr Air Test End Not Ready 7/25/2019 (8:00 - 10:00) 7/25/2019 (AM) 07/26/2019
Hydro Test Start Passed 7/30/2019 (8:00 - 10:00) 7/30/2019 (AM) 07/30/2019
Hydro Test End Passed 7/30/2019 (8:00 - 10:00) 7/30/2019 (AM) 07/30/2019
Fire Rough-in Inspection Passed 07/30/2019
24-hr Air Test Start Passed 7/30/2019 (10:00 - 12:00) 7/30/2019 (AM) 07/30/2019
24-hr Air Test End Passed 7/30/2019 (10:00 - 12:00) 7/30/2019 (AM) 07/31/2019
Fire Inspection Final Partial Pass 7/30/2019 (7:00 - 8:00) 7/30/2019 (AM) 07/31/2019
Fire Rough-in Inspection Partial Pass 8/7/2019 (10:00 - 12:00) 8/7/2019 (AM) 08/07/2019
Corrections:


Miscellaneous/Other
Comment Only
08/07/2019
Ok to cover hard lid bathrooms in transit area.

Fire Rough-in Inspection Partial Pass 9/5/2019 (8:00 - 10:00) 9/5/2019 (AM) 09/05/2019
Corrections:


Miscellaneous/Other
Carried Forward
09/30/2019
Partial rough in approved for transit common area, except window wash portion. Need to add sprinkler protection along west class wall, both sides.

Hydro Test Start Passed 10/1/2019 (10:00 - 12:00) 10/1/2019 (AM) 10/01/2019
Hydro Test End Passed 10/1/2019 (10:00 - 12:00) 10/1/2019 (AM) 10/01/2019
24-hr Air Test Start Passed 10/1/2019 (12:30 - 2:30) 10/1/2019 (PM) 10/02/2019
24-hr Air Test End Passed 10/2/2019 (12:30 - 2:30) 10/2/2019 (PM) 10/02/2019