Summary

PRFS201903406
Fire Suppression System
Finaled
BCS3 HOUSING LLC
Other
Provide new combined standpipe and wet & dry pipe fire sprinkler systems for new 6-story residential building with parking ramp structure.
04/15/2019
05/07/2019
02/23/2021
08/27/2020

Locations

Permits

Permit Number: PRFS201903406

Fire Suppression System
Finaled
05/07/2019
02/23/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rough-in Inspection Partial Pass 1/6/2020 (12:30 - 2:30) 08/27/2019
Corrections:


Miscellaneous/Other
Comment Only
08/27/2019
Partial rough in of standpipe, bulk pipe on 1st floor and rough in of heads in the southwest stairwell, floors 3-6 approved.

Fire Rough-in Inspection Partial Pass 9/5/2019 (8:00 - 10:00) 9/5/2019 (AM) 09/05/2019
Corrections:


Miscellaneous/Other
Comment Only
09/05/2019
Partial Rough In: Approved for South West floors 5 and 6 up to units 503 and 603.

Fire Rough-in Inspection Partial Pass 9/12/2019 (8:00 - 10:00) 9/12/2019 (AM) 09/12/2019
Corrections:


Miscellaneous/Other
Comment Only
09/12/2019
partial rough in. SW building floors 3-4 approved up to the x03 units.

Fire Rough-in Inspection Partial Pass 9/13/2019 (7:00 - 8:00) 9/13/2019 (AM) 09/13/2019
Corrections:


Miscellaneous/Other
Comment Only
09/13/2019
Partial rough. 2nd floor, SW building units up to 203. Contractor shall provide updated drawings and calcs. for 2nd floor SW.

Fire Rough-in Inspection Partial Pass 9/16/2019 (8:00 - 10:00) 9/16/2019 (AM) 09/16/2019
Corrections:


Miscellaneous/Other
Comment Only
09/16/2019
Partial rough in. Northwest 6 and 5 floors approved.

Fire Rough-in Inspection Partial Pass 9/17/2019 (8:00 - 10:00) 9/17/2019 (AM) 09/18/2019
Corrections:


Miscellaneous/Other
Comment Only
09/18/2019
Partial rough in. Approved for 4th floor of NW building.

Fire Rough-in Inspection Partial Pass 9/18/2019 (8:00 - 10:00) 9/18/2019 (AM) 09/18/2019
Corrections:


Miscellaneous/Other
Comment Only
09/18/2019
Partial rough in approved OK to cover third floor north west building.

Fire Rough-in Inspection Partial Pass 9/19/2019 (8:00 - 10:00) 9/19/2019 (AM) 09/25/2019
Fire Rough-in Inspection Partial Pass 10/15/2019 (7:00 - 8:00) 10/15/2019 (AM) 10/15/2019
Corrections:


Miscellaneous/Other
Comment Only
10/15/2019
Partial rough in approved for 1st northwest units and 1st floor of townhouse units.

Fire Rough-in Inspection Partial Pass 11/5/2019 (8:00 - 10:00) 11/5/2019 (AM) 11/05/2019
Corrections:


Miscellaneous/Other
Comment Only
11/05/2019
Partial rough in. Approved for 1st floor fitness room and related areas.

Fire Rough-in Inspection Partial Pass 11/18/2019 (8:00 - 10:00) 11/18/2019 (AM) 11/19/2019
Corrections:


Miscellaneous/Other
Comment Only
11/19/2019
6th floor and 5th floor southwest building.

Fire Rough-in Inspection Partial Pass 11/19/2019 (8:00 - 10:00) 11/19/2019 (AM) 11/19/2019
Fire Rough-in Inspection Partial Pass 11/20/2019 (8:00 - 10:00) 11/20/2019 (AM) 11/20/2019
Corrections:


Miscellaneous/Other
Comment Only
11/20/2019
Rough in approved for 3rd and 2nd floors of southwest building.

Fire Rough-in Inspection Partial Pass 11/21/2019 (8:00 - 10:00) 11/21/2019 (AM) 11/21/2019
Corrections:


Miscellaneous/Other
Comment Only
11/21/2019
Partial rough in. Approved for 1st floor of southwest building.

Fire Rough-in Inspection Partial Pass 12/23/2019 (10:00 - 12:00) 12/23/2019 (AM) 12/24/2019
Corrections:


Miscellaneous/Other
Comment Only
12/24/2019
Rough in of east building, floors 4-6 approved.

Fire Rough-in Inspection Partial Pass 1/6/2020 (12:30 - 2:30) 1/6/2020 (PM) 01/07/2020
Corrections:


Miscellaneous/Other
Comment Only
01/07/2020
NW Trash chute protection approved. Need to add flow switch for the dedicated trash chutes’ fire protection.

Fire Rough-in Inspection Partial Pass 1/23/2020 (10:00 - 12:00) 1/23/2020 (AM) 01/23/2020
Corrections:


Miscellaneous/Other
Comment Only
01/23/2020
Rough in approved for southeast building floors 2 and 3.

Fire Rough-in Inspection Partial Pass 2/7/2020 (8:00 - 10:00) 2/7/2020 (AM) 02/07/2020
Corrections:


Miscellaneous/Other
Comment Only
02/07/2020
Residential areas approved. Parking ramp still needs rough-in and final inspections.

Progress Inspection Passed 2/14/2020 (10:00 - 12:00) 2/14/2020 (AM) 02/14/2020
Hydro Test Start Partial Pass 2/18/2020 (8:00 - 10:00) 2/18/2020 (AM) 02/18/2020
Hydro Test End Partial Pass 2/18/2020 (10:00 - 12:00) 2/18/2020 (AM) 02/18/2020
Corrections:


Miscellaneous/Other
Comment Only
02/18/2020
Hydro of floor systems in northwest and southwest buildings approved.

Fire Rough-in Inspection Partial Pass 3/3/2020 (10:00 - 12:00) 3/3/2020 (AM) 03/04/2020
Corrections:


Miscellaneous/Other
Comment Only
03/04/2020
Witness commissioning of fire pump. Passed per 3rd party engineer report.

Fire Rough-in Inspection Partial Pass 3/17/2020 (8:00 - 10:00) 3/24/2020 (AM) 03/24/2020
Acceptance Test Inspection Partial Pass 03/24/2020
Corrections:


Miscellaneous/Other
Comment Only
03/24/2020
Testing of sprinkler water flow switches and tamper valves approved for Building A and B.

Hydro Test Start Passed 3/25/2020 (8:00 - 10:00) 3/25/2020 (AM) 03/25/2020
Hydro Test End Partial Pass 3/25/2020 (10:00 - 12:00) 3/25/2020 (AM) 03/25/2020
Corrections:


Miscellaneous/Other
Comment Only
03/25/2020
Hydro test of 6 dry systems for parking ramp and all wet standpipes approved.

24-hr Air Test Start Passed 04/06/2020
24-hr Air Test Start Passed 04/06/2020
Air test for dry parking ramp systems
24-hr Air Test End Passed 04/07/2020
Acceptance Test Inspection Passed 04/07/2020
Corrections:


Miscellaneous/Other
Comment Only
04/07/2020
Dry system tripped tests passed for all 6 systems in parking ramp.

Fire Inspection Final Passed 6/24/2020 (8:00 - 10:00) 6/24/2020 (AM) 06/24/2020
Hydro Test End Passed 06/24/2020
Fire Rough-in Inspection Passed 08/27/2020