PRFS201909261
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Inspection Final | Pending | |||
Fire Rough-in Inspection | Partial Pass | 10/30/2019 (8:00 - 10:00) | 10/30/2019 (AM) | 10/30/2019 |
Corrections:
Miscellaneous/Other
Outstanding
10/30/2019
Secure flex heads to grid in spa area, add heads to gears, add heads to low voltage room and front alcove, add heads on either side of front check in area as heads are too far off gear ceiling, covered or painted head near store front.
|
||||
Fire Rough-in Inspection | Passed | 11/15/2019 (8:00 - 10:00) | 11/15/2019 (AM) | 11/15/2019 |
Corrections:
Miscellaneous/Other
Resolved
11/15/2019
Secure flex heads to grid in spa area, add heads to gears, add heads to low voltage room and front alcove, add heads on either side of front check in area as heads are too far off gear ceiling, covered or painted head near store front.
|
||||
Missing concealer/escutcheon plates
Outstanding
11/15/2019
Missing concealer/escutcheon plates men’s hot water heater and womans head covered. Also missing in low voltage room.
|
||||
Fire Inspection Final | Not Ready | 11/15/2019 (8:00 - 10:00) | 11/15/2019 (AM) | 11/15/2019 |